Bid Opening Results

The bid opening results appearing on this page reflect the amount of each bid received and, subsequently, read at the bid opening. This summary is posted immediately after the bid opening and does not represent the official results. A bid tabulation with the official results will be posted within ten (10) days of the bid opening date and may be viewed in the Bid Tab section. In addition, SAWS will conduct a Determination of Contractor Responsibility for the apparent low bidder, prior to Board Award.

Results 561 - 580 of 822 « 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 »
Solicitation No. Type Job No. Close Date Project Name Details
CO-00045-JG IFB 14-1044 2/10/16 Kallison Ranch Area High School 24" Oversized Water Main View Results PDF
B-16-001-GC IFB 15-0130 2/3/16 SAWS Gonzales County Saturn Well Project View Results PDF
CD-B-15-036-SM IFB 2/2/16 2016 Annual Sanitary Sewer Main Point Repair, Manhole Adjustments and Laterals Construction Contract – Package 2 Project View Results PDF
CD-B-15-035-SM IFB 2/2/16 2016 Annual Sanitary Sewer Main Point Repair, Manhole Adjustments and Laterals Construction Contract – Package 1 Project View Results PDF
CO-00039-GC IFB 09-2507 12/30/15 Lift Station Elimination Phase II - Lift Station #217 Project View Results PDF
CO-00029-GC IFB 13-2511 12/2/15 Henderson Pass Odor Control Station Project View Results PDF
CO-00031-GC IFB 15-6504 11/24/15 Dos Rios Chlorine Contact Basin Scum Well Rehabilitation Project View Results PDF
B-15-032-GC IFB 16-0102,0702,1401 11/17/15 2016 Annual Water Distribution Leak Repairs Contract Package 2 Project View Results PDF
B-15-031-GC IFB 16-0101,0701,1401 11/17/15 2016 Annual Water Distribution Leak Repairs Contract Package 1 Project View Results PDF
CO-00023-GC IFB 15-4801 11/12/15 2015 UV CIPP Sanitary Sewer Construction Package VII Project View Results PDF
CO-00034-RA IFB 15-4801 11/12/15 2015 Pipe Bursting Sanitary Sewer Construction Package IX View Results PDF
CO-00030-GC IFB 13-6103 10/30/15 DSP Well Meter Replacement Phase 3 and 4 View Results PDF
CO-00018-MF IFB 14-4007 & 14-4507 10/28/15 C5 Culebra - Castroville to Laredo & C28 Zarzamora Creek - San Gabriel to NW 23rd Street Phase 1A Project View Results PDF
B-15-029-RA IFB 15-0125 10/14/15 Well Mitigation for City of Nixon View Results PDF
CO-00027-RA IFB 15-2513 10/8/15 Iron Horse Lift Station Odor Control Measures Project View Results PDF
CO-00019-RA IFB 14-4305 10/2/15 DSP US Hwy 281 Water Main Replacement Project View Results PDF
CO-00005-GC IFB 11-7002 10/2/15 Port San Antonio and Lackland AFB Water Improvement Project View Results PDF
CO-00013-RA IFB 15-4801 9/23/15 2015 Pipe Burst Sanitary Sewer Construction Package IV View Results PDF
CO-00024-GC IFB 14-4703 9/23/15 2015 Ralph St. 54-Inch Rehab Project View Results PDF
CO-00022-RA IFB 15-4801 9/23/15 2015 Pipe Burst Sanitary Sewer Construction Package III View Results PDF
Results 561 - 580 of 822 « 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 »