Bid Opening Results
The bid opening results appearing on this page reflect the amount of each bid received and, subsequently, read at the bid opening. This summary is posted immediately after the bid opening and does not represent the official results. A bid tabulation with the official results will be posted within ten (10) days of the bid opening date and may be viewed in the Bid Tab section. In addition, SAWS will conduct a Determination of Contractor Responsibility for the apparent low bidder, prior to Board Award.
Solicitation No.
|
Type
|
Job No.
|
Close Date
|
Project Name
|
Details
|
CO-00724-RM
|
IFB
|
23-4519
|
4/25/24
|
2023 Sewer Main Replacement Project 3
|
View Results PDF
|
CO-00744-RL
|
IFB
|
23-1044
|
4/23/24
|
Luensmann Off-Site Water Main Extension (Phase 2)
|
View Results PDF
|
CO-00729-TG
|
IFB
|
22-0152
|
4/19/24
|
West Side Operations Center Supply Building Drainage Improvements
|
View Results PDF
|
CO-00727-RL
|
IFB
|
23-5080 & 23-5580
|
4/9/24
|
2025 SMP Package IV (Bell Drive)
|
View Results PDF
|
CO-00728-JP
|
IFB
|
|
4/4/24
|
2024 Water Well Mitigation Program
|
View Results PDF
|
CO-00733-TG
|
IFB
|
22-1102
|
4/2/24
|
Tres Laurels 16-Inch Water Main Extension
|
View Results PDF
|
CO-00684-RL
|
IFB
|
23-4513
|
2/9/24
|
2021 CMOM Package 2A (CIPP) Project
|
View Results PDF
|
CO-00722-RM
|
IFB
|
22-1597
|
2/8/24
|
Ruby Crossing Offsite Sewer Gravity Main
|
View Results PDF
|
CO-00703-RL
|
IFB
|
22-7002
|
2/6/24
|
Mathis Road – Hardy Road to Waterwood Pass Approach Water Main
|
View Results PDF
|
CO-00705-JP
|
IFB
|
22-7008
|
1/31/24
|
Benclare Estates Offsite SAWS Pressure Reducing Valve Facility
|
View Results PDF
|
CO-00713-LE
|
IFB
|
22-4510
|
1/22/24
|
SAWS 2021 CMOM PACKAGE 6 - OPEN CUT AND PIPE BURST
|
View Results PDF
|
CO-00696-TG
|
IFB
|
24-0109 & 24-1401
|
1/18/24
|
2024 Annual Water Distribution Leak Repairs Contract Package 4
|
View Results PDF
|
CO-00695-TG
|
IFB
|
24-0108 & 24-1401
|
1/16/24
|
2024 Annual Water Distribution Leak Repairs Contract Package 3
|
View Results PDF
|
CO-00719-SM
|
IFB
|
23-7003
|
12/11/23
|
Stonehill Off-Site Water Extension Phase II
|
View Results PDF
|
CO-00716-RL
|
IFB
|
22-4004
|
12/8/23
|
North San Felipe Water Main Replacement Project
|
View Results PDF
|
CO-00717-RM
|
IFB
|
23-1043
|
12/5/23
|
Luensmann Off-Site Water Main Extension (Phase 1) Project
|
View Results PDF
|
CO-00712-RM
|
IFB
|
24-00111
|
12/1/23
|
2024 Annual Concrete Placement Work Order Construction Contract, Package 2
|
View Results PDF
|
CO-00711-RM
|
IFB
|
24-00110
|
11/30/23
|
2024 Annual Concrete Placement Work Order Construction Contract, Package 1
|
View Results PDF
|
CO-00545-RM
|
IFB
|
20-4531
|
11/16/23
|
2020 CMOM Package 6 (MAJOR ROADS)
|
View Results PDF
|
CO-00658-RM
|
IFB
|
22-4512
|
11/14/23
|
2021 CMOM Package 1
|
View Results PDF
|