Bid Opening Results
The bid opening results appearing on this page reflect the amount of each bid received and, subsequently, read at the bid opening. This summary is posted immediately after the bid opening and does not represent the official results. A bid tabulation with the official results will be posted within ten (10) days of the bid opening date and may be viewed in the Bid Tab section. In addition, SAWS will conduct a Determination of Contractor Responsibility for the apparent low bidder, prior to Board Award.
Solicitation No.
|
Type
|
Job No.
|
Close Date
|
Project Name
|
Details
|
CD-B-17-013-JAM
|
IFB
|
17-0108 , 1402, 1403
|
6/7/17
|
2017 Annual Sanitary Sewer Main Point Repair, Manhole Adjustments and Laterals Construction Contract, Package 1
|
View Results PDF
|
B-17-008-RA
|
IFB
|
17-0110
|
5/24/17
|
WATER WELL MITIGATION PROGRAM
|
View Results PDF
|
CO-00123-JAM
|
IFB
|
16-5520
|
5/4/17
|
DR1091-800 N. Loop 1604 Sewer Main East of Sigma Drive
|
View Results PDF
|
CO-00121-RA
|
IFB
|
14-6003
|
4/27/17
|
Broadband Access Points and Programmable Logic Controllers Replacement - Phase 1 Project
|
View Results PDF
|
CO-00108-GC
|
IFB
|
16-6010
|
4/27/17
|
Concept Therapy Institute Interconnect
|
View Results PDF
|
CO-00120-GC
|
IFB
|
14-6102
|
4/19/17
|
Salado PZ 1295 Booster Pump Station Project
|
View Results PDF
|
CO-00112-SM
|
IFB
|
16-4526
|
3/30/17
|
2016 Central Sewershed Package II
|
View Results PDF
|
CO-00119-RA
|
IFB
|
16-5011 & 16-5511
|
3/29/17
|
2017 Pipelines Water and Sewer Construction Package III
|
View Results PDF
|
CO-00118-RA
|
IFB
|
16-5001 & 16-5501
|
3/29/17
|
2017 Pipelines Water and Sewer Construction Package II
|
View Results PDF
|
CO-00117-RA
|
IFB
|
16-5007 & 16-5513
|
3/29/17
|
2017 Pipelines Water & Sewer Construction Package I
|
View Results PDF
|
CO-00105-JAM
|
IFB
|
16-4515
|
3/28/17
|
East Sewershed Package I
|
View Results PDF
|
CD-B-17-007-JG
|
IFB
|
17-0109 , 1402, 1403
|
3/24/17
|
2017 Annual Sanitary Sewer Main Point Repair, Manhole Adjustments and Laterals Construction Contract, Package 2
|
View Results PDF
|
CD-B-17-006-JG
|
IFB
|
17-0108 , 1402, 1403
|
3/24/17
|
2017 Annual Sanitary Sewer Main Point Repair, Manhole Adjustments and Laterals Construction Contract, Package 1
|
View Results PDF
|
CO-00077-GC
|
IFB
|
16-4507
|
3/23/17
|
E-20 Bypass Bore Construction Project
|
View Results PDF
|
B-17-010-SM
|
IFB
|
14-0703
|
3/20/17
|
DSP Tank Ladder Improvements Project
|
View Results PDF
|
CO-00116-JG
|
IFB
|
17-4520
|
3/3/17
|
2017 CIPP Small and Large Diameter Sanitary Sewer Construction Contract
|
View Results PDF
|
B-17-004-JG
|
IFB
|
17-0107 & 14-1401
|
3/2/17
|
2017 Annual Water Distribution Leak Repairs Contract, Package 4
|
View Results PDF
|
B-17-003-JG
|
IFB
|
17-0106 & 17-1401
|
3/2/17
|
2017 Annual Water Distribution Leak Repairs Contract, Package 3
|
View Results PDF
|
B-17-002-JG
|
IFB
|
17-0105 & 17-1401
|
3/1/17
|
2017 Annual Water Distribution Leak Repairs Contract, Package 2
|
View Results PDF
|
B-17-001-JG
|
IFB
|
17-0104 & 17-1401
|
3/1/17
|
2017 Annual Water Distribution Leak Repairs Contract - Package 1
|
View Results PDF
|