Bid Opening Results
The bid opening results appearing on this page reflect the amount of each bid received and, subsequently, read at the bid opening. This summary is posted immediately after the bid opening and does not represent the official results. A bid tabulation with the official results will be posted within ten (10) days of the bid opening date and may be viewed in the Bid Tab section. In addition, SAWS will conduct a Determination of Contractor Responsibility for the apparent low bidder, prior to Board Award.
Solicitation No.
|
Type
|
Job No.
|
Close Date
|
Project Name
|
Details
|
B-17-019-SM
|
IFB
|
17-0117
|
11/8/17
|
2017 Annual Concrete Placement Work Order Construction Contract – Package 2 Project
|
View Results PDF
|
B-17-018-SM
|
IFB
|
17-0116
|
11/8/17
|
2017 Annual Concrete Placement Work Order Construction Contract, Packages 1 Project
|
View Results PDF
|
CO-00147-JG
|
IFB
|
16-4520
|
11/6/17
|
East Sewershed Large Diameter Package III
|
View Results PDF
|
CO-00140-GC
|
IFB
|
17-4537
|
10/30/17
|
Central Sewershed Package 4 Project
|
View Results PDF
|
B-17-015-SM
|
IFB
|
17-0114
|
10/13/17
|
2017 Bi-Annual Asphalt Overlay Work Order Construction Contract, Package 1
|
View Results PDF
|
CO-00132-SM
|
IFB
|
15-4605
|
10/11/17
|
DR 999-1002 Rehabilitation Package
|
View Results PDF
|
CO-00142-JAM
|
IFB
|
17-4539
|
10/11/17
|
DR 999-1002 Open Cut Package Project
|
View Results PDF
|
CO-00137-JAM
|
IFB
|
16-7003 & 16-0122
|
10/6/17
|
Water Main Along Entrance to Encino PS/HWY. 281 to Encino Tank
& Facility 063, Loop 1604, Fuel Line Replacement Project
|
View Results PDF
|
CO-00139-GC
|
IFB
|
17-4528
|
10/2/17
|
Central Sewershed Package 3 Project
|
View Results PDF
|
CO-00138-JG
|
IFB
|
17-6007
|
8/31/17
|
Naco Lime Slurry System Project
|
View Results PDF
|
CO-00111-JAM
|
IFB
|
16-7003
|
7/11/17
|
Water Main Along Entrance to Encino PS/Hwy. 281 to Encino Tank Project
|
View Results PDF
|
CO-00129-JAM
|
IFB
|
17-4525
|
7/6/17
|
EAP II Package - 2017
|
View Results PDF
|
CO-00114-RA
|
IFB
|
17-4501
|
7/6/17
|
C5 Culebra – Castroville to Laredo & C28 Zarzamora Creek – San Gabriel to NW 23rd Street Phase 2 Project
|
View Results PDF
|
CO-00128-SM
|
IFB
|
16-1126
|
6/29/17
|
COX Manufacturing Project
|
View Results PDF
|
CO-00115-RA
|
IFB
|
15-2512
|
6/28/17
|
Lift Stations Rehabilitation - Phase 4 Project
|
View Results PDF
|
CO-00103-GC
|
IFB
|
16-4508
|
6/15/17
|
C 13 Broadway Corridor Package B Project
|
View Results PDF
|
CO-00130-GC
|
IFB
|
17-4536
|
6/12/17
|
2017 Edwards Aquifer Recharge Zone (EARZ) CIPP Construction Project
|
View Results PDF
|
B-17-012-RA
|
IFB
|
17-0115
|
6/9/17
|
2017 Bi-Annual Asphalt Overlay Work Order Construction Contract, Package 2
|
View Results PDF
|
B-17-011-RA
|
IFB
|
17-0114
|
6/9/17
|
2017 Bi-Annual Asphalt Overlay Work Order Construction Contract, Package 1
|
View Results PDF
|
CD-B-17-014-JAM
|
IFB
|
17-0109 , 1402, 1403
|
6/7/17
|
2017 Annual Sanitary Sewer Main Point Repair, Manhole Adjustments and Laterals Construction Contract, Package 2
|
View Results PDF
|