Bid Opening Results
The bid opening results appearing on this page reflect the amount of each bid received and, subsequently, read at the bid opening. This summary is posted immediately after the bid opening and does not represent the official results. A bid tabulation with the official results will be posted within ten (10) days of the bid opening date and may be viewed in the Bid Tab section. In addition, SAWS will conduct a Determination of Contractor Responsibility for the apparent low bidder, prior to Board Award.
Solicitation No.
|
Type
|
Job No.
|
Close Date
|
Project Name
|
Details
|
CD-B-16-019-SM
|
IFB
|
17-1402 & 17-0102
|
1/11/17
|
2017 Sanitary Sewer Laterals Renewal and Repair Construction Contract, Package 1
|
View Results PDF
|
CO-00096-RA
|
IFB
|
16-7504
|
12/20/16
|
Port SA Plant 325 and 356 Loop Interconnect Project
|
View Results PDF
|
CO-00104-DW
|
IFB
|
15-4506
|
12/15/16
|
E-19 Seguin Road to Nacogdoches Road – Segment 1
|
View Results PDF
|
CO-00093-JG
|
IFB
|
15-8605
|
12/6/16
|
WRIP Interconnect to Somerset Pump Station Project
|
View Results PDF
|
CO-00097-GC
|
IFB
|
15-4511 & 15-4514
|
11/11/16
|
C_13_Broadway Corridor-Package 2.C and 4.C Project
|
View Results PDF
|
CO-00099-JG
|
IFB
|
16-7004
|
11/9/16
|
Joint Base San Antonio Water Mains-Ft. Sam Houston
|
View Results PDF
|
CO-00091-GC
|
IFB
|
16-4801
|
11/9/16
|
Multiple Sewershed Package I
|
View Results PDF
|
CO-00066-JG
|
IFB
|
08-2512
|
11/2/16
|
OLMOS BASIN CENTRAL WATERSHED SEWER RELIEF LINE (C-3) SEWER REHABILITATION AT THE UNIVERSITY OF THE INCARNATE WORD
|
View Results PDF
|
CD-B-16-018-SM
|
IFB
|
17-0101 & 17-1403
|
11/2/16
|
2017 Annual Sanitary Sewer Manhole
Adjustment, Rehabilitation and Replacement Construction Contract, Package 1 Project
|
View Results PDF
|
CO-00095-JG
|
IFB
|
16-4505
|
10/31/16
|
East Sewershed Package II
|
View Results PDF
|
CO-00072-RA
|
IFB
|
13-6004
|
10/26/16
|
34th Street Pump Station Improvements
|
View Results PDF
|
CO-00092-JG
|
IFB
|
15-1177
|
10/26/16
|
Highland Estates, Unit P.U.D. Montana Pass Floating Ground Storage Tank Project
|
View Results PDF
|
CO-00084-DW
|
IFB
|
14-6504
|
10/14/16
|
Dos Rios Water Recycling Center (WRC) Electrical System Improvements - Phase 1 Project
|
View Results PDF
|
CO-00085-RA
|
IFB
|
16-5011 & 16-5511
|
10/11/16
|
2016 Pipelines Water and Sewer Construction Package III
|
View Results PDF
|
CO-00083-RA
|
IFB
|
16-5001 & 16-5501
|
10/11/16
|
2016 Pipelines Water and Sewer Construction Package II
|
View Results PDF
|
CO-00098-SM
|
IFB
|
14-4652
|
10/11/16
|
Castroville Rd. 48-Inch Rehab Project- DR 144
|
View Results PDF
|
CO-00088-RA
|
IFB
|
16-5007 & 16-5513
|
10/11/16
|
2016 Pipelines Water and Sewer Construction Package I
|
View Results PDF
|
B-16-021-GC
|
IFB
|
13-0118
|
10/10/16
|
I.H. 10 Ground Storage Tank Painting and Rehabilitation Project
|
View Results PDF
|
CO-00068-RA
|
IFB
|
09-2502
|
10/7/16
|
W-31 IH-10 Boerne Stage to Old Fredericksburg Rd.
|
View Results PDF
|
CO-00080-GC
|
IFB
|
16-6507
|
9/29/16
|
SAWS Dos Rios Sludge Blend Facilities Expansion Project
|
View Results PDF
|