Bid Opening Results
The bid opening results appearing on this page reflect the amount of each bid received and, subsequently, read at the bid opening. This summary is posted immediately after the bid opening and does not represent the official results. A bid tabulation with the official results will be posted within ten (10) days of the bid opening date and may be viewed in the Bid Tab section. In addition, SAWS will conduct a Determination of Contractor Responsibility for the apparent low bidder, prior to Board Award.
Solicitation No.
|
Type
|
Job No.
|
Close Date
|
Project Name
|
Details
|
B-12-005-DD
|
IFB
|
12-5003 & 12-5503
|
2/9/12
|
2012 Water & Sewer Construction Contract, Package III
|
View Results PDF
|
B-12-013-MR
|
IFB
|
12-0101
|
2/7/12
|
ANNUAL 2012 ASPHALT OVERLAY WORK ORDER CONSTRUCTION CONTRACT
|
View Results PDF
|
B-12-016-MF
|
IFB
|
12-2514
|
2/7/12
|
2012 Rehabilitation Work Order Construction Contract
|
View Results PDF
|
B-11-063-RA
|
IFB
|
10-7004
|
2/6/12
|
Forest Crest Water Local Benefit Main
|
View Results PDF
|
B-12-010-CM
|
IFB
|
08-2512
|
2/2/12
|
Olmos Basin Central Watershed Sanitary Sewer Relief Main (C-3) Reaches 1 to 4 Project
|
View Results PDF
|
B-11-050-MF
|
IFB
|
10-6501
|
1/30/12
|
Leon Creek Water Recycling Center (WRC) Interconnect to the Southwest Bexar Sewer Pipeline (SBSP) Project
|
View Results PDF
|
B-11-062-CM
|
IFB
|
12-6503
|
1/18/12
|
Dos Rios WRC Sludge Loading Building Permanent Stabilization
|
View Results PDF
|
B-11-030-DD
|
IFB
|
12-2505
|
1/12/12
|
Medina River Sewer Outfall - Segment 5
|
View Results PDF
|
B-11-058-CM
|
IFB
|
11-1064
|
1/11/12
|
Quiet Creek 16" Oversize (8" Required) Water Main Phase 1
|
View Results PDF
|
B-11-059-CM
|
IFB
|
10-1528 & 10-1529
|
1/10/12
|
Verano Phase 2 Sanitary Sewer Lines "A1" & "B"(10-1528) & Verano Phase 2 Lift Station #1 & 10-inch Force Main (10-1529)
|
View Results PDF
|
B-11-029-DD
|
IFB
|
12-2504
|
1/5/12
|
Medina River Sewer Outfall - Segment 4
|
View Results PDF
|
B-11-047-MF
|
IFB
|
08-2504
|
11/8/11
|
Lift Stations Rehabilitation, Phase 3
|
View Results PDF
|
B-11-051-CM
|
IFB
|
08-2512
|
11/4/11
|
Olmos Basin Central Watershed Sewer Relief Main (C-3)
|
View Results PDF
|
B-11-054-RA
|
IFB
|
10-4002
|
11/1/11
|
FM 78 12-inch Water Line from Woodlake Drive to Congressional Boulevard
|
View Results PDF
|
B-11-028-DD
|
IFB
|
11-2504
|
10/18/11
|
Medina River Sewer Outfall - Segment 3
|
View Results PDF
|
B-11-052-RA
|
IFB
|
09-2501
|
10/10/11
|
Far West Sewer Relief Main (FW-01) Project
|
View Results PDF
|
B-11-055-CM
|
IFB
|
11-6003
|
10/10/11
|
Perimeter Fence at Turtle Creek #3
|
View Results PDF
|
B-11-043-DD
|
IFB
|
11-4003
|
9/30/11
|
Annual 2011 Open Cut Water Work Order Construction Contract Project
|
View Results PDF
|
B-11-044-DD
|
IFB
|
11-4512
|
9/16/11
|
Annual 2011 Open Cut Sewer Work Order Construction Contract
|
View Results PDF
|
B-11-045-DG
|
IFB
|
10-7002
|
9/14/11
|
48-Inch Water Main - Micron to Anderson Tank Phase II Project
|
View Results PDF
|