The bid opening results appearing on this page reflect the amount of each bid received and, subsequently, read at the bid opening. This summary is posted immediately after the bid opening and does not represent the official results. A bid tabulation with the official results will be posted within ten (10) days of the bid opening date and may be viewed in the Bid Tab section. In addition, SAWS will conduct a Determination of Contractor Responsibility for the apparent low bidder, prior to Board Award.

Results 721 - 740 of 820 « 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 »
Solicitation No. Type Job No. Close Date Project Name Details
B-12-005-DD IFB 12-5003 & 12-5503 2/9/12 2012 Water & Sewer Construction Contract, Package III View Results PDF
B-12-013-MR IFB 12-0101 2/7/12 ANNUAL 2012 ASPHALT OVERLAY WORK ORDER CONSTRUCTION CONTRACT View Results PDF
B-12-016-MF IFB 12-2514 2/7/12 2012 Rehabilitation Work Order Construction Contract View Results PDF
B-11-063-RA IFB 10-7004 2/6/12 Forest Crest Water Local Benefit Main View Results PDF
B-12-010-CM IFB 08-2512 2/2/12 Olmos Basin Central Watershed Sanitary Sewer Relief Main (C-3) Reaches 1 to 4 Project View Results PDF
B-11-050-MF IFB 10-6501 1/30/12 Leon Creek Water Recycling Center (WRC) Interconnect to the Southwest Bexar Sewer Pipeline (SBSP) Project View Results PDF
B-11-062-CM IFB 12-6503 1/18/12 Dos Rios WRC Sludge Loading Building Permanent Stabilization View Results PDF
B-11-030-DD IFB 12-2505 1/12/12 Medina River Sewer Outfall - Segment 5 View Results PDF
B-11-058-CM IFB 11-1064 1/11/12 Quiet Creek 16" Oversize (8" Required) Water Main Phase 1 View Results PDF
B-11-059-CM IFB 10-1528 & 10-1529 1/10/12 Verano Phase 2 Sanitary Sewer Lines "A1" & "B"(10-1528) & Verano Phase 2 Lift Station #1 & 10-inch Force Main (10-1529) View Results PDF
B-11-029-DD IFB 12-2504 1/5/12 Medina River Sewer Outfall - Segment 4 View Results PDF
B-11-047-MF IFB 08-2504 11/8/11 Lift Stations Rehabilitation, Phase 3 View Results PDF
B-11-051-CM IFB 08-2512 11/4/11 Olmos Basin Central Watershed Sewer Relief Main (C-3) View Results PDF
B-11-054-RA IFB 10-4002 11/1/11 FM 78 12-inch Water Line from Woodlake Drive to Congressional Boulevard View Results PDF
B-11-028-DD IFB 11-2504 10/18/11 Medina River Sewer Outfall - Segment 3 View Results PDF
B-11-052-RA IFB 09-2501 10/10/11 Far West Sewer Relief Main (FW-01) Project View Results PDF
B-11-055-CM IFB 11-6003 10/10/11 Perimeter Fence at Turtle Creek #3 View Results PDF
B-11-043-DD IFB 11-4003 9/30/11 Annual 2011 Open Cut Water Work Order Construction Contract Project View Results PDF
B-11-044-DD IFB 11-4512 9/16/11 Annual 2011 Open Cut Sewer Work Order Construction Contract View Results PDF
B-11-045-DG IFB 10-7002 9/14/11 48-Inch Water Main - Micron to Anderson Tank Phase II Project View Results PDF