Bid Opening Results
The bid opening results appearing on this page reflect the amount of each bid received and, subsequently, read at the bid opening. This summary is posted immediately after the bid opening and does not represent the official results. A bid tabulation with the official results will be posted within ten (10) days of the bid opening date and may be viewed in the Bid Tab section. In addition, SAWS will conduct a Determination of Contractor Responsibility for the apparent low bidder, prior to Board Award.
Solicitation No.
|
Type
|
Job No.
|
Close Date
|
Project Name
|
Details
|
CO-00345-FG
|
IFB
|
18-4012
|
8/6/20
|
Meadowlark 16-inch Water Main Replacement
|
View Results PDF
|
CO-00333-JP
|
IFB
|
19-4533
|
7/29/20
|
2019 CMOM Package 2 (Urgent) Project
|
View Results PDF
|
B-20-006-FG
|
IFB
|
20-0112
|
7/28/20
|
Northeast Service Center Underground Storage Tank Permanent Removal Project
|
View Results PDF
|
CO-00335-RL
|
IFB
|
19-6505
|
7/13/20
|
Leon Creek WRC Electrical System Improvements – Phase I Project
|
View Results PDF
|
B-20-005-RL
|
IFB
|
20-0118
|
7/9/20
|
2020 Annual Water Distribution Leak Repairs Contract, Package VI
|
View Results PDF
|
B-20-004-RL
|
IFB
|
20-0117
|
7/9/20
|
2020 Annual Water Distribution Leak Repairs Contract, Package V
|
View Results PDF
|
CO-00324-JP
|
IFB
|
19-4536
|
6/26/20
|
Ellerman at S San Marcos Sewer Replacement
|
View Results PDF
|
CO-00310-SM
|
IFB
|
19-2502
|
6/11/20
|
Feathercrest and Stone Ridge Lift Stations Upgrades-Ph 3 and 4: New Feathercrest Lift Station
|
View Results PDF
|
CO-00340-SM
|
IFB
|
19-6510
|
6/11/20
|
H2Oaks Desalination Facility Septic System Replacement
|
View Results PDF
|
CO-00342-JP
|
IFB
|
19-4541
|
6/8/20
|
2019 CMOM Package 4 - EARZ
|
View Results PDF
|
CO-00319-RL
|
IFB
|
18-8607
|
5/28/20
|
H2OAKS DESALINATION FACILITY WELL SITE DEVELOPMENT
|
View Results PDF
|
CO-00299-JP
|
IFB
|
18-4535
|
5/14/20
|
BPC Central Large Diameter Package 1 Project
|
View Results PDF
|
CO-00313-JP
|
IFB
|
19-4516
|
5/6/20
|
Multiple Sewershed Package 11B
|
View Results PDF
|
CO-00338-FG
|
IFB
|
20-4403
|
5/1/20
|
C-13 Package B, Phase 1 Pavement Restoration Project
|
View Results PDF
|
CO-00328-SM
|
IFB
|
19-4510
|
4/24/20
|
BPC Central Large Diameter Package 2 Project
|
View Results PDF
|
CO-00332-SM
|
IFB
|
19-4544
|
4/17/20
|
Multiple Sewershed Package 12 - CIPP
|
View Results PDF
|
CO-00330-SM
|
IFB
|
18-4531
|
4/17/20
|
Multiple Sewershed Package 12 - Open Cut and Pipe Bursting Project
|
View Results PDF
|
CO-00320-RL
|
IFB
|
19-8610
|
4/13/20
|
H2Oaks Desalination Facility, Well Field Collection Pipeline Project
|
View Results PDF
|
B-20-003-SM
|
IFB
|
20-0114
|
4/13/20
|
Water Well Mitigation Program
|
View Results PDF
|
CO-00288-JP
|
IFB
|
17-7003
|
4/13/20
|
Hardy Oak Blvd, Sonterra Blvd, and Potranco Rd Pressure Zone Interconnections Project
|
View Results PDF
|