The bid opening results appearing on this page reflect the amount of each bid received and, subsequently, read at the bid opening. This summary is posted immediately after the bid opening and does not represent the official results. A bid tabulation with the official results will be posted within ten (10) days of the bid opening date and may be viewed in the Bid Tab section. In addition, SAWS will conduct a Determination of Contractor Responsibility for the apparent low bidder, prior to Board Award.

Results 341 - 360 of 822 « 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 »
Solicitation No. Type Job No. Close Date Project Name Details
CO-00187-SM IFB 17-2503 5/31/19 Lift Station 251 Elimination Project View Results PDF
CO-00264-FF IFB 19-4520 5/29/19 Multiple Sewershed Package 6B View Results PDF
B-19-010-SM IFB 19-0125 5/24/19 2019 Annual Water Distribution Leak Repairs, Package VIII Project View Results PDF
B-19-009-SM IFB 19-0124 5/23/19 2019 Annual Water Distribution Leak Repairs, Package VII Project View Results PDF
B-19-008-SM IFB 19-0123 5/22/19 2019 Annual Water Distribution Leak Repairs, Package VI Project View Results PDF
B-19-006-SM IFB 19-0122 5/22/19 2019 Annual Water Distribution Leak Repairs, Package V Project View Results PDF
CO-00267-FF IFB 18-4538 5/14/19 2018 EARZ CIPP View Results PDF
CO-00262-SM IFB 17-4009 5/7/19 West Ave - IH-10 to Jackson Keller View Results PDF
CO-00253-JP IFB 18-6007 & 17-7003 4/16/19 Carlisle Pump Station Drain Pipe and Potranco Road Interconnect View Results PDF
B-19-004-JAM IFB 19-0118 4/10/19 Dos Rios Building 17 Roof Replacement Project View Results PDF
CO-00209-JAM IFB 18-1083 4/8/19 Ladera - Offsite Water Line View Results PDF
B-19-005-FF IFB 19-0119 4/4/19 WATER WELL MITIGATION PROGRAM View Results PDF
CO-00265-JG IFB 17-4557 4/4/19 Multiple Sewershed Package 6A View Results PDF
CO-00218-SM IFB 17-4558 4/3/19 Multiple Sewershed Package 9 View Results PDF
CO-00172-SM IFB 18-6005 3/29/19 McMullen Tank Control Valve & Yard Piping Improvements View Results PDF
CO-00211-JG IFB 18-4527 3/29/19 2019 Unspecified Pipe Bursting Contract View Results PDF
CO-00176-JG IFB 17-4557 2/21/19 Multiple Sewershed Package 6 View Results PDF
CO-00258-FF IFB 19-1004 2/14/19 PALO ALTO TRAILS II 16-INCH APPROACH MAIN (8-INCH REQUIRED) View Results PDF
CO-00255-JP IFB 18-1658 2/6/19 Westpointe West Offsite Sewer Extension – Phase I View Results PDF
CD-B-19-003-JAM IFB 19-0105 & 19-1403 2/6/19 2019 Annual Sanitary Sewer Manhole Adjustment, Rehabilitation and Replacement Construction Contract, Package 3 View Results PDF