The bid opening results appearing on this page reflect the amount of each bid received and, subsequently, read at the bid opening. This summary is posted immediately after the bid opening and does not represent the official results. A bid tabulation with the official results will be posted within ten (10) days of the bid opening date and may be viewed in the Bid Tab section. In addition, SAWS will conduct a Determination of Contractor Responsibility for the apparent low bidder, prior to Board Award.
Solicitation No.
|
Type
|
Job No.
|
Close Date
|
Project Name
|
Details
|
CO-00083-RA
|
IFB
|
16-5001 & 16-5501
|
10/11/16
|
2016 Pipelines Water and Sewer Construction Package II
|
View Results PDF
|
CO-00098-SM
|
IFB
|
14-4652
|
10/11/16
|
Castroville Rd. 48-Inch Rehab Project- DR 144
|
View Results PDF
|
CO-00088-RA
|
IFB
|
16-5007 & 16-5513
|
10/11/16
|
2016 Pipelines Water and Sewer Construction Package I
|
View Results PDF
|
B-16-021-GC
|
IFB
|
13-0118
|
10/10/16
|
I.H. 10 Ground Storage Tank Painting and Rehabilitation Project
|
View Results PDF
|
CO-00068-RA
|
IFB
|
09-2502
|
10/7/16
|
W-31 IH-10 Boerne Stage to Old Fredericksburg Rd.
|
View Results PDF
|
CO-00080-GC
|
IFB
|
16-6507
|
9/29/16
|
SAWS Dos Rios Sludge Blend Facilities Expansion Project
|
View Results PDF
|
CD-B-16-017-SM
|
IFB
|
16-0117 & 16-1403
|
9/28/16
|
2016 Annual Sanitary Sewer Manhole Adjustment, Rehabilitation and Replacement Construction Contract, Package 4 Project
|
View Results PDF
|
CD-B-16-016-SM
|
IFB
|
16-0116 & 16-1403
|
9/28/16
|
2016 Annual Sanitary Sewer Manhole Adjustment, Rehabilitation and Replacement Construction Contract, Package 3 Project
|
View Results PDF
|
CO-00070-SM
|
IFB
|
14-4508
|
9/8/16
|
San Antonio River Outfall Pipeline Project No. 2A
|
View Results PDF
|
B-16-014-GC
|
IFB
|
13-0118
|
9/8/16
|
I.H. 10 Ground Storage Tank Painting and Rehabilitation Project
|
View Results PDF
|
CD-B-16-013-SM
|
IFB
|
16-0118 & 16-1403
|
8/10/16
|
2016 Annual Sanitary Sewer Manhole Adjustment, Rehabilitation and Replacement Construction Contract, Package 5 Project
|
View Results PDF
|
CO-00060-GC
|
IFB
|
13-2506
|
8/9/16
|
C-12 Donaldson Terrace Project
|
View Results PDF
|
CO-00078-RA
|
IFB
|
15-6104
|
8/4/16
|
Replace Stevens Ranch PS Ground Storage Tank
|
View Results PDF
|
CO-00082-RA
|
IFB
|
16-7002
|
7/27/16
|
Camp Bullis Road 12-inch Water Main Project
|
View Results PDF
|
CO-00069-SM
|
IFB
|
14-1178
|
7/19/16
|
Highland Estates 24 in. Oversize Approach Water Main (12 in. Required)
|
View Results PDF
|
CO-00081-JG
|
IFB
|
16-1055
|
7/15/16
|
East Evans 24" Approach and Border Main
|
View Results PDF
|
CD-B-16-012-SM
|
IFB
|
16-0117 & 16-1403
|
7/1/16
|
the 2016 Annual Sanitary Sewer Manhole Adjustment, Rehabilitation and Replacement Construction Contract, Package 4
|
View Results PDF
|
CD-B-16-011-SM
|
IFB
|
16-0116 & 16-1403
|
7/1/16
|
2016 Annual Sanitary Sewer Manhole Adjustment, Rehabilitation and Replacement Construction Contract, Package 3
|
View Results PDF
|
CD-B-16-010-SM
|
IFB
|
16-0115 & 16-1403
|
6/30/16
|
2016 Annual Sanitary Sewer Manhole Adjustment, Rehabilitation and Replacement Construction Contract, Package 2
|
View Results PDF
|
CO-00056-MF
|
IFB
|
15-4510 &15-4512
|
6/10/16
|
C-13 Broadway Corridor - Package 1.C and 3.C
|
View Results PDF
|