Bid Opening Results
The bid opening results appearing on this page reflect the amount of each bid received and, subsequently, read at the bid opening. This summary is posted immediately after the bid opening and does not represent the official results. A bid tabulation with the official results will be posted within ten (10) days of the bid opening date and may be viewed in the Bid Tab section. In addition, SAWS will conduct a Determination of Contractor Responsibility for the apparent low bidder, prior to Board Award.
Solicitation No.
|
Type
|
Job No.
|
Close Date
|
Project Name
|
Details
|
CO-00293-FF
|
IFB
|
18-4532
|
9/5/19
|
BPC CENTRAL SMALL DIAMETER PACKAGE 1
|
View Results PDF
|
CO-00285-SM
|
IFB
|
18-4542
|
9/4/19
|
Multiple Sewershed Package 10B - Open Cut
|
View Results PDF
|
CO-00291-SM
|
IFB
|
17-4560
|
8/30/19
|
Multiple Sewershed Package 8 - Replacement
|
View Results PDF
|
CO-00249-FF
|
IFB
|
18-4519
|
8/30/19
|
MULTIPLE SEWERSHED PACKAGE 10A - PIPEBURSTING
|
View Results PDF
|
CO-00283-FF
|
IFB
|
19-4527
|
8/29/19
|
MULTIPLE SEWERSHED PACKAGE 10A - CIPP
|
View Results PDF
|
CO-00280-FF
|
IFB
|
17-6003
|
8/27/19
|
BROADBAND ACCESS POINTS AND PROGRAMMABLE LOGIC CONTROLS REPLACEMENT - PHASE 2
|
View Results PDF
|
CO-00281-SM
|
IFB
|
17-2505
|
8/20/19
|
Feathercrest and Stone Ridge Lift Stations Upgrades Project – Phases 1 & 2 Thousand Oaks and Wetmore
|
View Results PDF
|
CO-00272-FF
|
IFB
|
18-4540
|
8/12/19
|
SILVERHORN GOLF COURSE 24-INCH REHAB PACKAGE
|
View Results PDF
|
CO-00266-SM
|
IFB
|
19-4515
|
8/9/19
|
Tobin Park 8-inch Siphon - CIPP
|
View Results PDF
|
CO-00277-JAM
|
IFB
|
18-4014 & 18-4537
|
8/9/19
|
San Joaquin Avenue (Ceralvo/Arboleda to Old Hwy 90W) Water & Sewer
|
View Results PDF
|
B-19-013-FF
|
IFB
|
19-0129
|
8/8/19
|
SILVER MOUNTAIN PUMP STATION REPLACEMENT
|
View Results PDF
|
CO-00279-FF
|
IFB
|
18-4533
|
8/8/19
|
BPC CENTRAL SMALL DIAMETER PACKAGE 2
|
View Results PDF
|
CO-00217
|
IFB
|
17-4559
|
7/29/19
|
Multiple Sewershed Package 7A
|
View Results PDF
|
CO-00284-SM
|
IFB
|
17-4538
|
7/25/19
|
Alamosa Drive & Hunstock Avenue DR 1131 Project
|
View Results PDF
|
B-19-012-JP
|
IFB
|
19-0127
|
7/15/19
|
Clouse Water Recycling Plant Buildings 10 and 11 - Roof Replacement Project
|
View Results PDF
|
CO-00252
|
IFB
|
18-4529
|
7/8/19
|
Central Sewershed Package 6
|
View Results PDF
|
B-19-007-FF
|
IFB
|
19-0121
|
6/19/19
|
DOS RIOS WRC PRIMARY CLARIFIER REHABILITATION
|
View Results PDF
|
CO-00275-JP
|
IFB
|
19-4522
|
6/17/19
|
Multiple Sewershed Package 9A Project
|
View Results PDF
|
CO-00260-JP
|
IFB
|
19-1051
|
6/3/19
|
Arcadia Plaza 24-Inch Oversize (12-Inch Required) Water Main Extension
|
View Results PDF
|
CO-00271-JP
|
IFB
|
19-1063
|
5/31/19
|
Sarfani Plaza 24-Inch Oversize (12-Inch Required) Water
Main Extension Project
|
View Results PDF
|