Bid Opening Results
The bid opening results appearing on this page reflect the amount of each bid received and, subsequently, read at the bid opening. This summary is posted after the bid opening and does not represent the official results. A bid tabulation with the official results will be posted within ten (10) days of the bid opening date and may be viewed in the Bid Tab section
Results 601 - 620 of 1272 | « 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 » |
Bid No. | Type | Close Date | Project Name | Details |
15-9012 | IFB | 8/6/15 | Annual Contract for Liquid Carbon Dioxide (99.5%) | View Results PDF |
15-15061 | IFB | 8/6/15 | Annual Contract for Pre-Mixed Two Stroke Engine Fuel | View Results PDF |
15-4051 | IFB | 8/6/15 | Annual Contract for Transmission Repair for Chrysler, General Motors, and Ford Parts and Service | View Results PDF |
15-0624 | IFB | 8/4/15 | Annual Contract for Parts Washer Service | View Results PDF |
15-0501 | IFB | 7/30/15 | Annual Contract for Sodium Bisulfite Solution | View Results PDF |
15-0023 | IFB | 7/30/15 | Biennial Contract for Portland Cement, Ready Mix (Quickrete) and Asphalt Cold Patch Bags | View Results PDF |
15-15064 | IFB | 7/29/15 | One Time Purchase of Panasonic Toughpad and Accessories | View Results PDF |
15-15077 | IFB | 7/27/15 | Purchase of Twenty (20) 18 Inch Butterfly Valves for the Dos Rios Water Recycling Center | View Results PDF |
15-15033 | IFB | 7/27/15 | Pilot Program for Wireless Fire Hydrant Pressure Monitors | View Results PDF |
15-15037 | IFB | 7/27/15 | Annual Contract for Janitorial Services at the Dos Rios Water Recycling Center | View Results PDF |
15-15029 | IFB | 7/27/15 | Purchase of Fifteen (15) Electromagnetic Flowmeters | View Results PDF |
15-15053A | IFB | 7/27/15 | Annual Contract for Locksmith Service (Non-Automotive) | View Results PDF |
15-0180 | IFB | 7/27/15 | Annual Contract for Sludge Drying Bed Aggregate | View Results PDF |
15-1138 | IFB | 7/23/15 | Annual Contract for Proficiency Test Sampling for SAWS Lab | View Results PDF |
15-0267 | IFB | 7/23/15 | Annual Contract for the Purchase of Automotive Storage Batteries | View Results PDF |
15-15056A | IFB | 7/21/15 | Purchase of Aluminum Stop Logs for the Dos Rios Water Recycling Center | View Results PDF |
15-15071 | IFB | 7/16/15 | Annual Contract for Three Phases of 30% Hydrated Lime Slurry | View Results PDF |
15-15073 | IFB | 7/14/15 | Sanitary Sewer Cleaning and Inspection of Designated "Year 3" Large Collection System Assets, Phase 2, Package 1 CONSENT DECREE RELATED | View Results PDF |
15-15074 | IFB | 7/14/15 | Sanitary Sewer Cleaning and Inspection of Designated "Year 3" Large Collection System Assets, Phase 2, Package 2 CONSENT DECREE RELATED | View Results PDF |
15-15075 | IFB | 7/14/15 | Sanitary Sewer Cleaning and Inspection of Designated "Year 3" Large Collection System Assets, Phase 2, Package 3 CONSENT DECREE RELATED | View Results PDF |
Results 601 - 620 of 1272 | « 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 » |