2013 Engineering Design Services – Replacements and Improvements

Solicitation No. Q-13-020-MR
Status: Selection Approved and Awarded
Awarded: 4/1/14
Due Date: 2:00 PM Friday, 11/15/13
Estimated Budget: $3,000,000.00

Awarded Firm:
K Friese & Associates, Inc.
Lockwood, Andrews & Newnam, Inc.
LNV, Inc.
Arredondo, Zepeda & Brunz, LLC

 

 

 

The San Antonio Water System (SAWS) is pursuing Professional Design Engineering Services for the replacement and installation of water and wastewater facilities and infrastructure in connection with unspecified projects. SAWS is accepting Statements of Qualifications in connection with the 2013 Engineering Design Services – Replacements & Improvements project, which will require a Scope of Services to be performed by a qualified consultant(s) or consulting firm(s) with the intent to award multiple contracts in the ranges of $300,000 to $650,000 each.

Notify Me

Receive updates sent straight to your inbox.

Interested Firm List

Firms who have obtained the RFQ proposal.

Downloads

Full RFQ Proposal
Note: You will be prompted to login to access the full proposal document.
Addendum 01
Nov. 1, 2013