University Health System Recycled Water Main Project
Awarded:
Subsurface Exploration and Geotechnical Data Report included with Addendum #2
Sealed bids are requested by the San Antonio Water System for the construction of approximately 2,090 linear feet of 14” outside diameter recycled water main by Horizontal Directional Drilling along Wurzbach Road and approximately 1,700 linear feet of 12” inside diameter recycled water main by open cut trenching along Wurzbach Road and Merton Minter Road for the University Health System Recycled Water Main Project, SAWS Job No. 11-8606-202.
Non-Mandatory
Pre-Bid
Meeting
9:00 AM, Thursday Jul. 12, 2012San Antonio Water System Customer Service Building, 2800 U.S. Hwy 281 N, San Antonio, Texas 78212; Conference Room CR-C137
Downloads
Full IFB Proposal
|
||
Addendum 2
Aug. 8, 2012 |
||
Awarded Firms
Sep. 14, 2012 |
||
Addendum
Jul. 17, 2012 |
||
Specifications
Jun. 27, 2012 Note: You must be logged in to access this document. |
||
Plans
Jun. 28, 2012 Note: You must be logged in to access this document. |
||
Bid Opening Results
Aug. 8, 2012 |
||
Bid Tab
Aug. 9, 2012 |