2023 SMP Package I (Refugio, Blaine St, Ward Ave) Project
Awarded: 11/2/22
Awarded Firm:
R.L. Jones LP
INVITATION TO BIDDERS
Solicitation No. CO-00572
Sealed bids are requested by the San Antonio Water System for the construction of approximately 2736 LF of 8” PVC C-900 Water main and 1090 LF of 8” PVC SDR 260 Sewer main for the 2023 SMP Package I (Refugio, Blaine St., Ward Ave.) Project, SAWS Job No. 21-5054 (Water) & 21-5552 (Sewer).
To view additional project information, as well as obtain the plans and specifications for this project, visit our website located at www.saws.org and click on the Business Center. Then select Bidder, Consultant, and Vendor Registration, which is located on the left-hand side of the screen. Select the Register Now button and proceed with registration.
For difficulties downloading plans and specifications, contact the Contracting Department at 210-233-3341.
A non-mandatory pre-bid meeting will be held at 10:30 AM (CT) on August 31, 2022 via WebEx.
https://saws.webex.com
Meeting number (access code): 2498 382 2358
Meeting password: CO-00572
Audio Connection: (210) 233-2090
For questions regarding this solicitation, technical questions or additional information, please contact Stella Manzello, Contract Administrator, in writing via email to: Stella.Manzello@saws.org or by fax to (210) 233-4290 until 4:00 PM (CT) on September 6, 2022. Answers to the questions will be posted to the web site by 4:00 PM (CT) on September 14, 2022 as a separate document or included as part of an addendum. Please be advised that Bidders are prohibited from communicating with any other SAWS staff, the Consultant, the Developer, or City of San Antonio officials regarding this IFB up until the contract is awarded as outlined in the Instructions to Bidders.
Due to the COVID-19 emergency and to protect the health of the public, SAWS is implementing new procedures for the submission of bids. Bids will be received either Electronically or through Sealed bids, until 10:00 AM (CDT), September 20, 2022. Electronic bids will be received via the secure SAWS FTP site. Sealed bids will be received by Contract Administration, 2800 U.S. Hwy 281 North, Tower II, Customer Center Building, via a drop box located on the left wall when walking through the first set of double glass doors of the main Tower II entry on the north side of the building, San Antonio, Texas 78212. See the Electronic Bid Opening Instructions attachment for additional information regarding an electronic bid submittal. Electronic bids shall be accompanied by a bid bond in an amount not less than five percent of the total bid price. (Or, if providing SAWS with a cashier's check or certified check in an amount not less than five percent of the total bid price, SAWS will request this within 24 hours from the apparent low bidder. Sealed bids must be accompanied by a cashier's check, certified check, or bid bond in an amount not less than five percent of the total bid price. Bids will then be publicly opened and read aloud by Contract Administration via WebEx.
If Bidders intend to submit bids electronically, Bidders will need to submit a request by September 19, 2022 by 10:00 AM CDT to receive access to the File Transfer Protocol (FTP) site via email to Stella.Manzello@saws.org. Bidder’s email requesting access to the FTP site shall provide the legal name of Bidder’s company and the intended recipient’s email address and phone number. No requests for FTP site access will be accepted after September 19, 2022 by 10:00 AM (CDT).
Bid opening WebEx meeting will be held at 10:00 AM (CDT) on September 20, 2022.
https://saws.webex.com
Audio Connection: (210) 233-2090
Meeting number (access code): 2498 728 6560
Meeting password: CO-00572-SM
Non-Mandatory
Pre-Bid
Meeting
10:30 AM, Wednesday Aug. 31, 2022WEBEX ONLY: https://saws.webex.com Meeting number (access code): 2498 382 2358 Meeting password: CO-00572 Audio Connection: (210) 233-2090
Downloads
CO-00572 Non Mandatory Pre Bid Presentation
Aug. 31, 2022 |
||
CO-00572 Non Mandatory Pre Bid Sign In Sheet
Aug. 31, 2022 |
||
Addendum 1
Sep. 14, 2022 |
||
Addendum 2
Sep. 15, 2022 |
||
Specifications
Aug. 22, 2022 Note: You must be logged in to access this document. |
||
Water Plans
Aug. 22, 2022 Note: You must be logged in to access this document. |
||
Sewer Plans
Aug. 22, 2022 Note: You must be logged in to access this document. |
||
Bid Opening Results
Sep. 20, 2022 |
||
Bid Tab
Oct. 12, 2022 |