Silver Mountain Pump Station Upgrades

Solicitation No. PS-00133-SR
Status: Selection Approved and Awarded
Awarded: 10/5/22
Due Date: 10:00 AM Wednesday, 7/20/22

Awarded Firm: Kimley-Horn & Associates

 

 

 
 
See Addendum #2  with Changes to the Timeline and details to the 2nd Non-Mandatory Pre-Submittal added 

See Addendum #1 with Changes to Written Questions Due 

 

 REQUEST FOR QUALIFICATIONS

The San Antonio Water System (SAWS) is pursuing a Request for Qualifications (RFQs) for professional engineering services for the Silver Mountain Pump Station Upgrades (“Project”).  Statements of Qualifications (SOQs) from interested firms (Respondents) are being accepted in connection with the project, which will require the scope of services to be performed by qualified professional engineering firms (Consultants).  The selected professional engineering firm shall provide engineering services entailing engineering evaluations, studies, reports, preliminary engineering, design, bid, construction, and overall project management services for the design and construction of the Project.

The services will include, but not limited to, project management and coordination, civil, structural and electrical engineering services, instrumentation and controls, surveying, permitting, subsurface utility engineering, preliminary engineering and studies, design, scheduling, cost estimating, construction management and other services as necessary for the Project. 

Non-Mandatory
Pre-Submittal Meeting

2:00 PM, Thursday Jun. 23, 2022
WEBEX ONLY: https://saws.webex.com Audio Connection: (210) 233-2090 Meeting number (access code): 2484 364 8110 Meeting password: 6v7aXP8PCKJ

Notify Me

Receive updates sent straight to your inbox.

Interested Firm List

Firms who have obtained the RFQ proposal.

Downloads

Full RFQ Proposal
Note: You will be prompted to login to access the full proposal document.
Evaluation Criteria FIllable Forms
Jun. 1, 2022
Non-Mandatory Pre-Submittal Presentation 6-9-2022
Jun. 9, 2022
PS-00133 Non-Mandatory Pre Submittal Meeting Sign-In Sheet
Jun. 9, 2022
Addendum #1
Jun. 14, 2022
Addendum #2
Jun. 17, 2022
Non-Mandatory Pre-Submittal Presentation 6-23-2022
Jun. 22, 2022
Non-Mandatory Pre-Submittal Meeting Sign-In Sheet 6-23-2022
Jun. 23, 2022
Addendum #3
Jun. 30, 2022