Cagnon Ground Storage Tank Replacement Project
Awarded: 3/9/22
Awarded Firm:
DN TANKS
REQUEST FOR COMPETITIVE SEALED PROPOSALS
(RFCSP)
Solicitation No. CO-00436-SM
Sealed bids are requested by the San Antonio Water System for the Cagnon Pump Station including a new 2.0 MG ground storage tank; connection to new WRIP interconnect pipeline, flow control valves, large diameter steel yard piping, electrical and instrumentation equipment, concrete foundations, painting above-grade piping and overcoating existing elevated storage tank, demolition of existing structures, site grading and drainage, fence replacement and other site improvements for the Cagnon Ground Storage Tank Replacement Project, SAWS Job No. 20-6010.
To view additional project information, as well as obtain the plans and specifications for this project, visit our website located at www.saws.org and click on the Business Center. Then select Bidder, Consultant, and Vendor Registration, which is located on the left-hand side of the screen. Select the Register Now button and proceed with registration.
For difficulties downloading plans and specifications, contact the Contracting Department at 210-233-3341.
A non-mandatory pre-proposal meeting will be held at 2:00 PM (CT) on September 13, 2021 via WebEx.
https://saws.webex.com
Meeting number (access code): 1468 37 9382
Meeting password: RMcq3ZxZe36
Audio Connection: (210) 233-2090
For questions regarding this solicitation, technical questions or additional information, please contact Stella Manzello, Contract Administrator in writing via email to: Stella.Manzello@saws.org or by fax to (210) 233-4290 until 4:00 PM (CDT) on September 28 16, 2021. Answers to the questions will be posted to the web site by 4:00 PM (CDT) on September 23 October 1, 2021 as a separate document or included as part of an addendum. Be advised that firms responding to this RFCSP (Respondents) are prohibited from communicating with any other SAWS staff, the Consultant, the Developer, or COSA officials regarding this RFCSP up until the contract is awarded as outlined in the Instructions to Respondents.
the Instructions to Respondents.
Due to the COVID-19 emergency and to protect the health of the public, SAWS is implementing new procedures for the submission of proposals. Proposals will be received electronically only, until 1:00 PM (CDT), October 11, 2021. Electronic proposals will be received via the secure SAWS FTP site. See the Electronic Proposal Opening Instructions attachment for additional information regarding an electronic proposal submittal. Electronic proposals shall be accompanied by a bid bond in an amount not less than five percent of the total proposal price. (Or, if providing SAWS with a cashier's check or certified check in an amount not less than five percent of the total proposal price, SAWS will request this within 24 hours from the Respondent who did not submit a bid bond). Proposals will then be publicly opened and read aloud by Contract Administration via WebEx.
https://saws.webex.com
Audio Connection: (210) 233-2090
Meeting number (access code): 1462 31 8364
Meeting password: pcSrKKaE288
Respondents will need to submit a request by October 8, 2021 at 1:00 PM (CDT) to receive access to the File Transfer Protocol (FTP) site via email to Stella.Manzello@saws.org. Respondent’s email requesting access to the FTP site shall provide the legal name of Respondent’s company and the intended recipient’s email address and phone number. No requests for FTP site access will be accepted after October 8, 2021 at 1:00 PM (CDT).
Non-Mandatory
Pre-Submittal
Meeting
2:00 PM, Monday Sep. 13, 2021WebEx
Downloads
Geotech Report
Aug. 30, 2021 |
||
Non-Mandatory Pre-Proposal Presentation
Sep. 13, 2021 |
||
Non-Mandatory Pre-Proposal Sign-In Sheet
Sep. 13, 2021 |
||
Evaluation Criteria Forms - Word Version
Sep. 1, 2021 |
||
Final Evaluation Scoring
Dec. 10, 2021 |
||
Addendum 1
Sep. 7, 2021 |
||
Addendum 2
Sep. 20, 2021 |
||
Addendum 3
Sep. 22, 2021 |
||
Addendum 4
Oct. 1, 2021 |
||
Specifications
Aug. 30, 2021 Note: You must be logged in to access this document. |
||
Plans
Aug. 30, 2021 Note: You must be logged in to access this document. |
||
Bid Tab
Nov. 30, 2021 |
||
Preliminary Eng. Report
Aug 30, 2021 Note: You will be prompted to login to access this document. |
||
Asbestos Survey Report
Oct 4, 2021 Note: You will be prompted to login to access this document. |