PRODUCTION FACILITIES ENGINEERING, GEOTECHNICAL AND SURVEYING WORK ORDER CONTRACT 2019
Awarded: 5/7/19
Awarded Firm:
CP&Y, Inc. dba STV Infrastructure
The San Antonio Water System is pursuing professional engineering services for the 2019 Production and Transmission Engineering Capital Improvement Projects. Statements of Qualifications are being accepted from qualified professional engineering teams in connection with these projects, which will require scope of services to be performed on an as-needed or work order basis for an initial one (1) year term with an optional one (1) year extension. The selected professional engineering team, will provide engineering services to include planning, geotechnical, surveying, engineering evaluations, studies, reports, design, bid, construction and overall project management in SAWS’ water production facilities and transmission main projects included in the Capital Improvements Program.
Downloads
Full RFQ Proposal
Note: You will be prompted to login to access the full proposal document. |