W-6 UPPER SEGMENT: HIGHWAY 90 TO SW MILITARY DRIVE SEWER MAIN

Solicitation No. PS-00068-FF
Status: Selection Approved and Awarded
Awarded: 2/12/19
Due Date: 1:00 PM Friday, 12/14/18
Estimated Budget: $15,000,000.00

Awarded Firm: Kimley-Horn and Associates

 

The San Antonio Water System (SAWS) is accepting Statements of Qualifications (SOQ) from firms to provide professional engineering design services, as well as all associated engineering services, necessary to advance the sanitary sewer overflow and reduction program (SSORP) project known as W-6 Upper Segment to the final design phase, which includes both bid and construction phase services. The project addresses a capacity constraint within the western sewershed, which serves approximately 500,000 residents. See Project Charter, Attachment I, for an exhibit showing the proposed project alignment and limits. This project consists of replacing approximately 19,000 LF of existing 54-inch sanitary sewer main with 29,000 LF of 60-inch and 90-inch gravity sanitary sewer pipelines.  The project also includes tie-ins to two other CD projects, the W-1 Lower Segment and the W-6 Middle Segment.  Additionally, the project will include tie-ins to a number of existing smaller collector lines throughout the proposed alignment.  The project extends from a location east of Leon Creek along U.S. Highway 90 (US90) to the intersection of US90 and Military Drive, then heads southward along Military Drive to Pearsall Road.  Proposed alignment includes installation of 2,250 LF of large diameter (60-inch) sewer installation via open cut along US90 and installation of 26,750 LF of large diameter (90-inch) sewer via deep tunneling (100 foot or greater) from the connection to the W-1 Lower Segment Project to the tie-in with the W-6 Middle Segment Project.

 

The existing interceptor through JBSA Lackland, a 54-inch sewer line, will be maintained to provide local service to the military installation. The existing 54-inch interceptor is not part of this solicitation.

 

The anticipated services will include civil engineering, geotechnical engineering, tunnel engineering, project management, investigation, topographic survey services, subsurface utility engineering, design, construction management, project coordination, preliminary engineering, final design, and other engineering services as necessary for this project. Engineering disciplines under this contract may include civil, environmental, structural, geotechnical, and or other types of engineering and supporting sciences (e.g., geology, environmental, archaeology, etc.).

 

NOTE: PLEASE BE PATIENT WHEN DOWNLOADING  LARGE FILES SUCH AS THE ENVIRONMENTAL SITE ASSESSMENT AND TECHNICAL MEMORANDUMS.

Non-Mandatory
Pre-Submittal Meeting

2:00 PM, Wednesday Nov. 28, 2018
San Antonio Water System Customer Service Building, 2800 U.S. Hwy 281 N, San Antonio, Texas 78212; Conference Room CR-C145

Notify Me

Receive updates sent straight to your inbox.

Interested Firm List

Firms who have obtained the RFQ proposal.

Downloads

Full RFQ Proposal
Note: You will be prompted to login to access the full proposal document.
Evaluation Criteria Forms
Nov. 16, 2018
Addendum 1
Nov. 21, 2018
Addendum 2
Nov. 26, 2018
Phase I Environmental Site Assessment
Nov. 28, 2018
W-6 Lower Reach Feasibility Technical Memorandum
Nov. 28, 2018
W-6 Upper Reach Feasibility Technical Memorandum
Nov. 28, 2018
Non-Mandatory Pre-Submittal Sign-In Sheet
Nov. 28, 2018
Pre-Submittal Conference Presentation
Nov. 28, 2018
Addendum 3
Nov. 30, 2018