Central Water Integration Pipeline – Segment 5-1
The Central Water Integration Project (CWIP) will provide up to 50,000 acre-feet of water to meet growth needs and diversify our water supply. Part of CWIP includes the construction of approximately 10,300 linear feet of 54-inch diameter steel water main from the Terminus Water Treatment Facility to the intersection of South Loop 1604 frontage road and Voigt Drive where Pipeline Segment 5-1 will connect to an existing 48-inch diameter ductile iron water main.