Central Water Integration Pipeline – Segment 5-1

Solicitation No.
Status: Upcoming Bid Opportunity
Due Date: 2:00 PM Wednesday, 7/11/18
Estimated Budget: $37,400,000.00

The Central Water Integration Project (CWIP) will provide up to 50,000 acre-feet of water to meet growth needs and diversify our water supply. Part of CWIP includes the construction of approximately 10,300 linear feet of 54-inch diameter steel water main from the Terminus Water Treatment Facility to the intersection of South Loop 1604 frontage road and Voigt Drive where Pipeline Segment 5-1 will connect to an existing 48-inch diameter ductile iron water main.

The Segment 5-1 pipeline will be constructed and placed into service by January 2020.
 
The Owner is providing a Draft of the Geotechnical Baseline Report (GBR) for information to prospective bidders and/or equipment manufacturers and suppliers. The Draft GBR contains an early form of the information set that will eventually be made available to Bidders with the Contract Documents. It is being issued in Draft form to allow potential bidders to both engage in early discussions with tunnel boring machines (TBM) and rock boring machines (RBM) manufacturers or experienced TBM and RBM refurbishers. The GBR contains a Draft Plan and Profile for the Segment 5-1 Pipeline illustrating the locations for each reach that will need to be constructed along with a draft description of the project components.
 
SAWS intends to bid the project in July 2018.
 

Notify Me

Receive updates sent straight to your inbox.

Downloads

Project Fact Sheet
Jun. 18, 2018
Geotechnical Baseline Report and Drawings
Jun. 18, 2018