2017 Sanitary Sewer Overflow and Reduction Program (SSORP) Engineering Design Contracts
Awarded: 3/6/18
Awarded Firm: Bain Medina Bain, Inc.; Halff Associates, Inc.; Weston Solutions, Inc.
DEADLINE DATE AND TIME HAS CHANGED. SEE ADDENDUM 4.
The San Antonio Water System (SAWS) is accepting Statements of Qualifications (SOQ) from firms to provide professional engineering design services, as well as all associated engineering services necessary to advance three (3) sanitary sewer overflow and reduction program (SSORP) projects to the final design phase, which includes both bid and construction phase services. SAWS will provide Respondents with 10% technical memorandums (TM) for each of the projects as part of this RFQ. 30% design deliverables will be made available to the selected firms for each project during the negotiation phase, which will be the basis for the scope of work.
Non-Mandatory
Pre-Submittal
Meeting
10:00 AM, Friday Aug. 11, 2017San Antonio Water System Customer Service Building, 2800 U.S. Hwy 281 N, San Antonio, Texas 78212; Conference Room C-145
Downloads
Full RFQ Proposal
Note: You will be prompted to login to access the full proposal document. |
||
Non-Mandatory Pre-Bid Meeting Presentation
Aug. 11, 2017 |
||
Sign-In Sheet (Have Done Business)
Aug. 11, 2017 |
||
Sign-n Sheet (Have Not Done Business)
Aug. 11, 2017 |
||
Clarification
Aug. 30, 2017 |
||
Addendum 1
Aug. 21, 2017 |
||
Addendum 2
Aug. 23, 2017 |
||
Addendum 3
Sep. 1, 2017 |
||
Addendum 4
Sep. 5, 2017 |
||
10 Percent Technical Memorandum for Project ID C-30
Aug 21, 2017 Note: You will be prompted to login to access this document. |
||
10 Percent Technical Memorandum for Project ID C-69
Aug 21, 2017 Note: You will be prompted to login to access this document. |
||
10 Percent Technical Memorandum for Project ID C-18
Aug 21, 2017 Note: You will be prompted to login to access this document. |