Dos Rios WRC Electrical System Improvements – Phase 2
Awarded: 4/14/17
Awarded Firm:
Gupta & Associates Inc
The San Antonio Water System (SAWS) is accepting Statements of Qualifications in connection with the Dos Rios Water Recycling Center (WRC) Electrical System Improvements – Phase 2 Project. The Project will require services to be performed by a qualified engineering consultant or consulting firm. A program was initiated to assess, rehabilitate and upgrade the Dos Rios WRC electrical system in multiple phases to be completed by 2025. These improvements shall be implemented in such a manner to minimize impacts to Dos Rios WRC operations.
Non-Mandatory
Pre-Submittal
Meeting
2:00 PM, Tuesday Nov. 29, 2016San Antonio Water System Customer Service Building, 2800 U.S. Hwy 281 N, San Antonio, Texas 78212; Conference Room C-137
Downloads
Full RFQ Proposal
Note: You will be prompted to login to access the full proposal document. |
||
Non-Mandatory Pre-Submittal Sign In sheet
Nov. 29, 2016 |
||
Non-Mandatory Pre-Submittal Conference Slides
Nov. 29, 2016 |
||
CONDITIONS AND DISCLAIMER FOR USE OF VOLUMES I AND V
Nov. 30, 2016 |
||
Addendum 1
Nov. 30, 2016 |
||
Addendum 2
Dec. 6, 2016 |