West View Pump Station Improvements Contract

Solicitation No. PS-00030-GC
Status: Selection Pending Board Approval
Due Date: 10:00 AM Friday, 10/28/16
Estimated Budget: $120,000.00

The San Antonio Water System (SAWS) is pursuing professional consulting services for the 2017 Production and Transmission Engineering Capital Improvement Projects.  Statements of Qualifications are being accepted in connection with these projects, which will require Scope of Services to be performed by qualified professional engineering teams.  The selected professional engineering  teams shall provide consulting services entailing planning, engineering evaluations, studies, reports, design, bid, construction and overall project management in SAWS’ water production facilities and transmission main projects that are included in the Capital Improvements Program (CIP). 

The project provides for construction of a new 200,000-gallon bolted steel tank, and a new 1.5 MGD well, to replace existing 167,000 gallon tank and the capped 1.5 MGD well. Project shall include demolition of the existing tank and proper plugging of the well. The existing facility pumps from one well, when two wells are needed. The facility is outside SAWS' CCN and partially in the City's ETJ. It serves 350 customers. The Redbird Ranch development is in the area.

Notify Me

Receive updates sent straight to your inbox.

Interested Firm List

Firms who have obtained the RFQ proposal.

Downloads

Full RFQ Proposal
Note: You will be prompted to login to access the full proposal document.
Addendum 1
Oct. 20, 2016
Summary Sheet.pdf
Oct. 28, 2016