Vista Ridge Integration Project Owner’s Representative

Solicitation No. Q-16-001-RA
Status: Selection Approved and Awarded
Awarded: 3/24/17
Due Date: 2:00 PM Thursday, 6/30/16

Awarded Firm: Black & Veatch Corporation

SAWS is currently seeking an Owner’s Representative (OR) to provide professional engineering services for the Vista Ridge Integration Project (VRIP). The OR will provide pipeline and water quality analysis, preliminary engineering design, develop a design criteria package (DCP), assist in the procurement of a Design-Build firm (DB), as well as provide project management and construction management services for the infrastructure necessary to treat and integrate water from a 45 MGD treatment plant into the SAWS distribution system. Professional engineering services provided by the OR shall be in full compliance with Texas Occupational Code Ann. § C § 1001.001.

Design build shall have the meaning provided under Texas Government Code Ann. § 2269 and may be referred to in this document as design-build, DB, Design-Build, Design/Build. While SAWS fully anticipates using the Design Build (DB) procurement method for this project, this RFQ shall not be construed to limit SAWS’ evaluation of qualifications conducted herein from applying to services for or related to other traditional or alternative delivery methods allowed under law, should it become in the best interest of SAWS to use such other methods of procurement for this project.

Respondents are required to attend a mandatory pre-submittal meeting in order to submit a proposal for this RFQ.

Mandatory
Pre-Submittal Meeting

2:00 PM, Wednesday Jun. 15, 2016
San Antonio Water System Customer Service Building, 2800 U.S. Hwy 281 N, San Antonio, Texas 78212; Conference Room C-145

Notify Me

Receive updates sent straight to your inbox.

Interested Firm List

Firms who have obtained the RFQ proposal.

Downloads

Full RFQ Proposal
Note: You will be prompted to login to access the full proposal document.
Addendum 2
Jun. 23, 2016
Mandatory Pre-Bid Presentation
Jun. 15, 2016
Mandatory Pre-bid Sign-in Sheet
Jun. 15, 2016
Non-Disclosure Form - Infrastructure Plan
Jun. 22, 2016
Addendum 1
Jun. 22, 2016