2015 Annual Sanitary Sewer Main Point Repair, Manhole Adjustments and Laterals Construction Contract – Package 2
Awarded: 6/10/15
Awarded Firm:
D Guerra Construction LLC
Sealed bids are requested by the San Antonio Water System for the purpose of retaining a Contractor to furnish all labor, materials, equipment and supervision to perform point repairs to the wastewater collection system pipelines, to replace laterals, to replace manholes, and to adjust and/or rehabilitate manholes, on a work order contract basis for the 2015 Annual Sanitary Sewer Main Point Repair, Manhole Adjustments and Laterals Construction Contract – Package 2 Project, SAWS Job Nos. 15-0110 (O&M) and 15-1402 (CIP) and 15-1403 (CIP)
To view additional project information, as well as obtain the plans and specifications for this project, visit our website located at www.saws.org and click on the Business Center. Then select Bidder, Consultant, and Vendor Registration, which is located on the left-hand side of the screen. Select the Register Now button and proceed with registration.
Non-Mandatory
Pre-Bid
Meeting
10:00 AM, Monday Apr. 20, 2015San Antonio Water System’s Customer Center Building, Tower II, 1st floor, Contract Administration, Suite 171, Conference Room 169, 2800 U.S. Hwy 281 North, San Antonio, Texas
Downloads
Addendum No. 1
Apr. 17, 2015 |
||
Non-Mandatory Pre-Bid Sign In Sheet
Apr. 20, 2015 |
||
Addendum No. 2
Apr. 22, 2015 |
||
Specifications
Apr. 6, 2015 Note: You must be logged in to access this document. |
||
Bid Opening Results
Apr. 28, 2015 |
||
Bid Tab
May. 12, 2015 |