Bid Opening Results
The bid opening results appearing on this page reflect the amount of each bid received and, subsequently, read at the bid opening. This summary is posted immediately after the bid opening and does not represent the official results. A bid tabulation with the official results will be posted within ten (10) days of the bid opening date and may be viewed in the Bid Tab section. In addition, SAWS will conduct a Determination of Contractor Responsibility for the apparent low bidder, prior to Board Award.
Solicitation No.
|
Type
|
Job No.
|
Close Date
|
Project Name
|
Details
|
B-17-010-SM
|
IFB
|
14-0703
|
3/20/17
|
DSP Tank Ladder Improvements Project
|
View Results PDF
|
CO-00116-JG
|
IFB
|
17-4520
|
3/3/17
|
2017 CIPP Small and Large Diameter Sanitary Sewer Construction Contract
|
View Results PDF
|
B-17-004-JG
|
IFB
|
17-0107 & 14-1401
|
3/2/17
|
2017 Annual Water Distribution Leak Repairs Contract, Package 4
|
View Results PDF
|
B-17-003-JG
|
IFB
|
17-0106 & 17-1401
|
3/2/17
|
2017 Annual Water Distribution Leak Repairs Contract, Package 3
|
View Results PDF
|
B-17-002-JG
|
IFB
|
17-0105 & 17-1401
|
3/1/17
|
2017 Annual Water Distribution Leak Repairs Contract, Package 2
|
View Results PDF
|
B-17-001-JG
|
IFB
|
17-0104 & 17-1401
|
3/1/17
|
2017 Annual Water Distribution Leak Repairs Contract - Package 1
|
View Results PDF
|
CO-00110-JG
|
IFB
|
16-4529
|
2/24/17
|
2016 Large Diameter CIPP Construction Contract
|
View Results PDF
|
CO-00107-SM
|
IFB
|
14-4657
|
2/10/17
|
Flores 24” Rehab Project – DR. No 128 Project
|
View Results PDF
|
CO-00100-SM
|
IFB
|
16-7005
|
2/3/17
|
Joint Base San Antonio Water Mains - Lackland AFB and Medina Annex Project
|
View Results PDF
|
CO-00101-GC
|
IFB
|
16-6509
|
1/27/17
|
Leon Creek WRC RAS Pump Station Replacement Project
|
View Results PDF
|
CO-00109-RA
|
IFB
|
16-7711
|
1/18/17
|
Judson Road Perimeter Fence Project
|
View Results PDF
|
CD-B-16-020-SM
|
IFB
|
17-1402 & 17-0103
|
1/11/17
|
2017 Sanitary Sewer Laterals Renewal and Repair Construction Contract, Package 2
|
View Results PDF
|
CD-B-16-019-SM
|
IFB
|
17-1402 & 17-0102
|
1/11/17
|
2017 Sanitary Sewer Laterals Renewal and Repair Construction Contract, Package 1
|
View Results PDF
|
CO-00096-RA
|
IFB
|
16-7504
|
12/20/16
|
Port SA Plant 325 and 356 Loop Interconnect Project
|
View Results PDF
|
CO-00104-DW
|
IFB
|
15-4506
|
12/15/16
|
E-19 Seguin Road to Nacogdoches Road – Segment 1
|
View Results PDF
|
CO-00093-JG
|
IFB
|
15-8605
|
12/6/16
|
WRIP Interconnect to Somerset Pump Station Project
|
View Results PDF
|
CO-00097-GC
|
IFB
|
15-4511 & 15-4514
|
11/11/16
|
C_13_Broadway Corridor-Package 2.C and 4.C Project
|
View Results PDF
|
CO-00099-JG
|
IFB
|
16-7004
|
11/9/16
|
Joint Base San Antonio Water Mains-Ft. Sam Houston
|
View Results PDF
|
CO-00091-GC
|
IFB
|
16-4801
|
11/9/16
|
Multiple Sewershed Package I
|
View Results PDF
|
CO-00066-JG
|
IFB
|
08-2512
|
11/2/16
|
OLMOS BASIN CENTRAL WATERSHED SEWER RELIEF LINE (C-3) SEWER REHABILITATION AT THE UNIVERSITY OF THE INCARNATE WORD
|
View Results PDF
|