Bid Opening Results

The bid opening results appearing on this page reflect the amount of each bid received and, subsequently, read at the bid opening. This summary is posted immediately after the bid opening and does not represent the official results. A bid tabulation with the official results will be posted within ten (10) days of the bid opening date and may be viewed in the Bid Tab section. In addition, SAWS will conduct a Determination of Contractor Responsibility for the apparent low bidder, prior to Board Award.

Results 461 - 480 of 828 « 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 »
Solicitation No. Type Job No. Close Date Project Name Details
CO-00125-SM IFB 16-1659 12/6/17 Mission Del Lago - Offsite Sewer Improvements (15-Inch Required - 27-Inch Oversize) View Results PDF
CD-B-17-017-SM IFB 18-0102 & 18-1403 11/29/17 2018 Annual Sanitary Sewer Manhole Adjustment, Rehabilitation and Replacement Construction Contract, Package 2 Project View Results PDF
CD-B-17-016-SM IFB 18-0101 & 18-1403 11/29/17 2018 Annual Sanitary Sewer Manhole Adjustment, Rehabilitation and Replacement Construction Contract, Package 1 Project View Results PDF
CO-00144-DW IFB 15-6101 11/10/17 Zarzamora Pump Station Improvements Project View Results PDF
CO-00143 IFB 16-1613 11/8/17 Classen-Steubing Oversized Sewer Main Project View Results PDF
CO-00150 IFB 17-1112 11/8/17 Harlach Farms Subdivision 16-Inch and 24-Inch Approach Water Main View Results PDF
B-17-019-SM IFB 17-0117 11/8/17 2017 Annual Concrete Placement Work Order Construction Contract – Package 2 Project View Results PDF
B-17-018-SM IFB 17-0116 11/8/17 2017 Annual Concrete Placement Work Order Construction Contract, Packages 1 Project View Results PDF
CO-00147-JG IFB 16-4520 11/6/17 East Sewershed Large Diameter Package III View Results PDF
CO-00140-GC IFB 17-4537 10/30/17 Central Sewershed Package 4 Project View Results PDF
B-17-015-SM IFB 17-0114 10/13/17 2017 Bi-Annual Asphalt Overlay Work Order Construction Contract, Package 1 View Results PDF
CO-00132-SM IFB 15-4605 10/11/17 DR 999-1002 Rehabilitation Package View Results PDF
CO-00142-JAM IFB 17-4539 10/11/17 DR 999-1002 Open Cut Package Project View Results PDF
CO-00137-JAM IFB 16-7003 & 16-0122 10/6/17 Water Main Along Entrance to Encino PS/HWY. 281 to Encino Tank & Facility 063, Loop 1604, Fuel Line Replacement Project View Results PDF
CO-00139-GC IFB 17-4528 10/2/17 Central Sewershed Package 3 Project View Results PDF
CO-00138-JG IFB 17-6007 8/31/17 Naco Lime Slurry System Project View Results PDF
CO-00111-JAM IFB 16-7003 7/11/17 Water Main Along Entrance to Encino PS/Hwy. 281 to Encino Tank Project View Results PDF
CO-00129-JAM IFB 17-4525 7/6/17 EAP II Package - 2017 View Results PDF
CO-00114-RA IFB 17-4501 7/6/17 C5 Culebra – Castroville to Laredo & C28 Zarzamora Creek – San Gabriel to NW 23rd Street Phase 2 Project View Results PDF
CO-00128-SM IFB 16-1126 6/29/17 COX Manufacturing Project View Results PDF
Results 461 - 480 of 828 « 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 »