Resiliency Initiatives Project
Awarded: 8/2/22
Awarded Firm:
Weston Solutions, Inc.
See Addenda #2 & 3 with Changes to Timeline
See Addendum #4 with Changes to Pre-Submittal Meeting
See Addendum #5 for notification regarding future communication
REQUEST FOR QUALIFICATIONS
The San Antonio Water System (SAWS) is pursuing Requests for Qualifications (RFQ) for professional engineering services for the Resiliency Initiatives project (“Project”). Statements of Qualifications (SOQs) from interested firms (Respondents) are being accepted in connection with this Project, which will require the scope of services to be performed by a qualified professional engineering firm. The selected professional engineering firm(s) shall provide engineering services entailing planning, engineering evaluations, studies, reports, preliminary engineering, design, bid, construction, start-up, commissioning, and overall project management services for the design and construction of the Project.
The anticipated services will include project management and coordination, electrical, instrumentation and controls, SCADA, civil, mechanical, HVAC, structural, architectural, surveying, permitting, geotechnical engineering, subsurface utility engineering, preliminary engineering, design, scheduling, cost estimating, construction management, and other services as necessary for the project.
SAWS anticipates awarding one or more work order type contracts encompassing one or more facilities to qualified consultants from this RFQ. SAWS reserves the right to package those contracts in a way that facilitates compliance with regulatory requirements as described in the Emergency Preparedness Plan dated March 1, 2022.
Mandatory
Pre-Submittal
Meeting
1:30 PM, Tuesday May. 24, 2022SAWS Customer Service Building - Tower II - 2800 US Hwy 281 North, SATX 78212, CR-145 & CR-154
Downloads
Full RFQ Proposal
Note: You will be prompted to login to access the full proposal document. |
||
Addendum 2
Apr. 21, 2022 |
||
Mandatory Pre-Submittal Conference Attendee List
May. 27, 2022 |
||
Fillable Forms_Addendum 6 Revised
Jun. 8, 2022 |
||
Addendum 1
Apr. 14, 2022 |
||
Addendum 3
May. 4, 2022 |
||
Addendum 4
May. 13, 2022 |
||
Addendum 5
May. 24, 2022 |