Bid Opening Results

The bid opening results appearing on this page reflect the amount of each bid received and, subsequently, read at the bid opening. This summary is posted immediately after the bid opening and does not represent the official results. A bid tabulation with the official results will be posted within ten (10) days of the bid opening date and may be viewed in the Bid Tab section. In addition, SAWS will conduct a Determination of Contractor Responsibility for the apparent low bidder, prior to Board Award.

Results 281 - 300 of 828 « 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 »
Solicitation No. Type Job No. Close Date Project Name Details
CO-00328-SM IFB 19-4510 4/24/20 BPC Central Large Diameter Package 2 Project View Results PDF
CO-00332-SM IFB 19-4544 4/17/20 Multiple Sewershed Package 12 - CIPP View Results PDF
CO-00330-SM IFB 18-4531 4/17/20 Multiple Sewershed Package 12 - Open Cut and Pipe Bursting Project View Results PDF
CO-00320-RL IFB 19-8610 4/13/20 H2Oaks Desalination Facility, Well Field Collection Pipeline Project View Results PDF
B-20-003-SM IFB 20-0114 4/13/20 Water Well Mitigation Program View Results PDF
CO-00288-JP IFB 17-7003 4/13/20 Hardy Oak Blvd, Sonterra Blvd, and Potranco Rd Pressure Zone Interconnections Project View Results PDF
CO-00329-RL IFB 18-1674 4/9/20 WESTPOINTE WEST OFF-SITE SEWER EXTENSION PHASE 2 View Results PDF
CO-00315-RL IFB 19-6011 4/9/20 MICRON PUMP STATION WELL PUMP NO. 4 View Results PDF
B-20-001-JAM IFB 20-0115 3/17/20 2020 Annual Asphalt Overlay Work Order Construction Contract, Package I View Results PDF
B-20-002-RL IFB 19-0134 3/9/20 VAN DYKE SERVICE CENTER FUEL DISPENSING FACILITIES DEMOLITION View Results PDF
CO-00322-FG IFB 18-4536 3/6/20 Central Sewershed Package 7 - UIW View Results PDF
CO-00318-FG IFB 18-4534 2/3/20 BPC EAST/WEST SMALL DIAMETER PACKAGE 1 - CIPP PROJECT View Results PDF
CO-00321-JP IFB 19-6503 2/3/20 Steven M. Clouse Water Recycling Center Sand Drying Bed Improvements Project View Results PDF
CO-00312-RL IFB 19-1019 1/29/20 DICKERSON 16-INCH OVERSIZE (8-INCH REQUIRED) WATER MAIN EXTENSION View Results PDF
B-19-031-JAM IFB 20-0112 1/15/20 2020 Annual Concrete Placement Work Order Construction Contract, Package I View Results PDF
CO-00294-FF IFB 18-4004 1/13/20 PLEASANTON ROAD WATER MAIN REPLACEMENT AT HUME ROAD PROJECT View Results PDF
CO-00316-FF IFB 19-4517 12/17/19 BLUE WING ROAD TO IH 37 SEWER PROJECT View Results PDF
CO-00309-JP IFB 19-6503 12/16/19 Steven M. Clouse Water Recycling Center Sand Drying Bed Improvements Project View Results PDF
CD-B-19-024-AT IFB 20-0107 12/4/19 2020 Annual Sanitary Sewer Main Point Repair, Manhole Adjustments and Laterals Construction Contract, Package 2 View Results PDF
CD-B-19-023-AT IFB 20-0106 12/4/19 2020 Annual Sanitary Sewer Main Point Repair, Manhole Adjustments and Laterals Construction Contract, Package 1 View Results PDF
Results 281 - 300 of 828 « 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 »