2021 Sanitary Sewer Overflow and Reduction Program (SSORP) Engineering Design Services Package 1

Solicitation No. PS-00117-LE
Status: Selection Approved and Awarded
Awarded: 7/26/22
Due Date: 2:00 PM Friday, 10/1/21

Awarded Firm: Garver, LLC
RPS Infrastructure, Inc.
Ardurra Group, Inc
Lockwood Andrews & Newnam, Inc
Bain Medina Bain, Inc.
Garcia Infrastructure Consultants, LLC
WGI, Inc.
K Friese & Associates, Inc.

PLEASE SEE ADDENDUM 4 CHANGE FOR PROPOSAL DUE DATE

 **Electronic Submissions Only**

2021 Sanitary Sewer Overflow and Reduction Program (SSORP) Engineering Design Services Package 1 

Solicitation No. PS-00117

 

The San Antonio Water System (SAWS) is accepting Statements of Qualifications (SOQ's) from firms to provide professional engineering design services, as well as all associated engineering services, necessary to advance the sanitary sewer overflow and reduction program (SSORP) projects identified within this RFQ to the final design phase, which includes both bid and construction phase services. SAWS will provide Respondents with design deliverables as part of this RFQ. 

It is anticipated that SAWS will award seven (7) Capacity Management, Operations and Maintenance (CMOM) program packages and one (1) unspecified Pipelines Condition Improvement Engineering Services contracts totaling $7 million, as a result of this Request for Qualifications (RFQ).

Non-Mandatory
Pre-Submittal Meeting

2:00 PM, Wednesday Sep. 8, 2021
WebEx Only https://saws.webex.com Meeting number (access code): 146 831 2276 Password: BBpPbaVB385 Connect by Phone: (210) 233-2090

Notify Me

Receive updates sent straight to your inbox.

Interested Firm List

Firms who have obtained the RFQ proposal.

Downloads

Full RFQ Proposal
Note: You will be prompted to login to access the full proposal document.
Project Scoping Report CMOM Package 1
Aug. 26, 2021
Project Scoping Report CMOM Package 2
Aug. 26, 2021
Project Scoping Report CMOM Package 3
Aug. 26, 2021
Project Scoping Report CMOM Package 4
Aug. 26, 2021
Project Scoping Report CMOM Package 5
Aug. 26, 2021
Project Scoping Report CMOM Package 6
Aug. 26, 2021
Project Scoping Report CMOM Package 7
Aug. 26, 2021
Project Scoping Report CMOM Pkg 2 Addendum 1
Sep. 2, 2021
Non-Mandatory Pre-Submittal Presentation_9.8.21
Sep. 8, 2021
Non-Mandatory Pre-Submittal Sign In Sheet_9.8.21
Sep. 8, 2021
Updated Evaluation Criteria Forms Word Version
Sep. 21, 2021
Addendum 1
Sep. 2, 2021
Addendum 2
Sep. 2, 2021
Project Scoping Report CMOM Pkg 5 Addendum 1
Sep. 2, 2021
Addendum 3
Sep. 15, 2021
Addendum 4
Sep. 21, 2021