Bid Opening Results
The bid opening results appearing on this page reflect the amount of each bid received and, subsequently, read at the bid opening. This summary is posted immediately after the bid opening and does not represent the official results. A bid tabulation with the official results will be posted within ten (10) days of the bid opening date and may be viewed in the Bid Tab section. In addition, SAWS will conduct a Determination of Contractor Responsibility for the apparent low bidder, prior to Board Award.
Solicitation No.
|
Type
|
Job No.
|
Close Date
|
Project Name
|
Details
|
CO-00260-JP
|
IFB
|
19-1051
|
6/3/19
|
Arcadia Plaza 24-Inch Oversize (12-Inch Required) Water Main Extension
|
View Results PDF
|
CO-00271-JP
|
IFB
|
19-1063
|
5/31/19
|
Sarfani Plaza 24-Inch Oversize (12-Inch Required) Water
Main Extension Project
|
View Results PDF
|
CO-00187-SM
|
IFB
|
17-2503
|
5/31/19
|
Lift Station 251 Elimination Project
|
View Results PDF
|
CO-00264-FF
|
IFB
|
19-4520
|
5/29/19
|
Multiple Sewershed Package 6B
|
View Results PDF
|
B-19-010-SM
|
IFB
|
19-0125
|
5/24/19
|
2019 Annual Water Distribution Leak Repairs, Package VIII Project
|
View Results PDF
|
B-19-009-SM
|
IFB
|
19-0124
|
5/23/19
|
2019 Annual Water Distribution Leak Repairs, Package VII Project
|
View Results PDF
|
B-19-008-SM
|
IFB
|
19-0123
|
5/22/19
|
2019 Annual Water Distribution Leak Repairs, Package VI Project
|
View Results PDF
|
B-19-006-SM
|
IFB
|
19-0122
|
5/22/19
|
2019 Annual Water Distribution Leak Repairs, Package V Project
|
View Results PDF
|
CO-00267-FF
|
IFB
|
18-4538
|
5/14/19
|
2018 EARZ CIPP
|
View Results PDF
|
CO-00262-SM
|
IFB
|
17-4009
|
5/7/19
|
West Ave - IH-10 to Jackson Keller
|
View Results PDF
|
CO-00253-JP
|
IFB
|
18-6007 & 17-7003
|
4/16/19
|
Carlisle Pump Station Drain Pipe and Potranco Road Interconnect
|
View Results PDF
|
B-19-004-JAM
|
IFB
|
19-0118
|
4/10/19
|
Dos Rios Building 17 Roof Replacement Project
|
View Results PDF
|
CO-00209-JAM
|
IFB
|
18-1083
|
4/8/19
|
Ladera - Offsite Water Line
|
View Results PDF
|
B-19-005-FF
|
IFB
|
19-0119
|
4/4/19
|
WATER WELL MITIGATION PROGRAM
|
View Results PDF
|
CO-00265-JG
|
IFB
|
17-4557
|
4/4/19
|
Multiple Sewershed Package 6A
|
View Results PDF
|
CO-00218-SM
|
IFB
|
17-4558
|
4/3/19
|
Multiple Sewershed Package 9
|
View Results PDF
|
CO-00172-SM
|
IFB
|
18-6005
|
3/29/19
|
McMullen Tank Control Valve & Yard Piping Improvements
|
View Results PDF
|
CO-00211-JG
|
IFB
|
18-4527
|
3/29/19
|
2019 Unspecified Pipe Bursting Contract
|
View Results PDF
|
CO-00176-JG
|
IFB
|
17-4557
|
2/21/19
|
Multiple Sewershed Package 6
|
View Results PDF
|
CO-00258-FF
|
IFB
|
19-1004
|
2/14/19
|
PALO ALTO TRAILS II 16-INCH APPROACH MAIN (8-INCH REQUIRED)
|
View Results PDF
|