2012 Annual Sanitary Sewer Main Point Repair and Manhole Adjustments Construction Contract - Package 1 Project
Awarded:
Sealed bids are requested by the San Antonio Water System for the purpose of retaining a Contactor to furnish all labor, materials, equipment and supervision to perform point repairs to the wastewater collection system pipelines to replace laterals, as well as adjust and/or rehabilitate manholes on a work order contract basis for the 2012 Annual Sanitary Sewer Main Point Repair and Manhole Adjustments Construction Contract – Package 1 Project, SAWS Job Nos. 12-0108 and 12-1402.
Non-Mandatory
Pre-Bid
Meeting
2:00 PM, Tuesday May. 15, 2012San Antonio Water System Customer Service Building, 2800 U.S. Hwy 281 N, San Antonio, Texas 78212; Conference Room CR-C137
Downloads
Full IFB Proposal
|
||
Pre-Bid Meeting Sign In Sheet
May. 17, 2012 |
||
Awarded Firm
Sep. 14, 2012 |
||
Specifications
Apr. 30, 2012 Note: You must be logged in to access this document. |
||
Bid Opening Results
May. 30, 2012 |
||
Bid Tab
Jun. 8, 2012 |