Regional Carrizo: Buckhorn Wellfield Collection Project
Awarded: 1/3/14
Awarded Firm:
Sealed bids are requested by the San Antonio Water System for construction of approximately 81,000 linear feet of HDPE water line, varying in diameter from 18 inches through 36 inches; completion of 9 existing production well sites; rehabilitation of the existing Bebe well site; and construction of the final phase of the access roads and low water crossings for the Buckhorn Well Field, SAWS Job No. 03-8518-207. The Project site is located in western Gonzales County between the cities of Nixon and Gonzales.
Mandatory
Pre-Bid
Meeting
10:00 AM, Monday Apr. 30, 2012San Antonio Water System Customer Service Building, 2800 U.S. Hwy 281 N, San Antonio, Texas 78212; Conference Room C-154
Downloads
Full IFB Proposal
|
||
Sign In Sheet
Apr. 30, 2012 |
||
Awarded Firms
Sep. 28, 2012 |
||
Addendum I
May. 4, 2012 |
||
Supplemental - Geotechnical Report
Apr. 13, 2012 |
||
Specifications
Apr. 13, 2012 Note: You must be logged in to access this document. |
||
Plans
Apr. 13, 2012 Note: You must be logged in to access this document. |
||
Bid Opening Results
May. 10, 2012 |
||
Bid Tab
May. 23, 2012 |