Culebra Creek Property Drainage Improvement Project
Awarded:
Sealed bids are requested by the San Antonio Water System for the installation of rock rubble rip rap, a 10’x10’ junction box, removing and replacing existing rip-rap, removing and hauling off existing drainage structures to capture storm water in a storm water detention basin on SAWS property for the Culebra Creek Property Improvements Project, SAWS Job No. 12-0102.
Non-Mandatory
Pre-Bid
Meeting
1:30 PM, Thursday Apr. 5, 2012San Antonio Water System Customer Service Building, 2800 U.S. Hwy 281 N, San Antonio, Texas 78212; Conference Room C-137
Downloads
Full IFB Proposal
|
||
Non-Mandatory Pre-Bid Sign-In Sheet
Apr. 5, 2012 |
||
Addendum No. 1
Apr. 9, 2012 |
||
Addendum No. 2
Apr. 11, 2012 |
||
Specifications
Mar. 28, 2012 Note: You must be logged in to access this document. |
||
Plans
Mar. 28, 2012 Note: You must be logged in to access this document. |
||
Bid Opening Results
Apr. 13, 2012 |
||
Bid Tab
Apr. 20, 2012 |