2024 Water Main Replacement Projects
REQUEST FOR QUALIFICATIONS
2024 WATER MAIN REPLACEMENT PROJECTS
RELEASE DATE: March 8, 2024
SOLICITATION NO: PS-00170
DEADLINE: April 17, 2024 at 2:00pm (CST)
**ELECTRONIC SUBMISSION ONLY**
The San Antonio Water System (SAWS) is pursuing Requests for Qualifications (RFQ) for professional engineering services for the 2024 Water Main Replacement Project (“Project”). Statements of Qualifications (SOQs) from interested firms (Respondents) are being accepted in connection with this Project, which will require the scope of services to be performed by a qualified professional engineering firm. The selected professional engineering firm(s) shall provide engineering services entailing planning, engineering evaluations, studies, reports, preliminary engineering, design, bid, construction, start-up/commissioning, and overall project management services for the design and construction of the Project.
The anticipated services will include project management and coordination, civil, mechanical, structural, and electrical engineering services, instrumentation and controls, surveying, permitting, geotechnical engineering, subsurface utility engineering, environmental services, archeological services, preliminary engineering, design, scheduling, cost estimating, construction management and other services as necessary for the Project.
SAWS anticipates awarding contracts to more than one Consultant as a result of this RFQ. At SAWS sole discretion, SAWS may award any project within this RFQ regardless of the projects identified on Respondent’s Project Submittal Identification form.
Non-Mandatory
Pre-Submittal
Meeting
1:00 PM, Tuesday Mar. 19, 2024WebEx
Downloads
Full RFQ Proposal
Note: You will be prompted to login to access the full proposal document. |
||
Addendum 1
Mar. 8, 2024 |
||
Pre-Bid Presentation
Mar. 19, 2024 |
||
Addendum 2
Apr. 3, 2024 |
||
Pre-Submittal Sign In Sheet
Apr. 3, 2024 |