Regional Carrizo Project Schertz Parkway Pump Station
Awarded:
BID OPENING HAS BEEN POSTPONED UNTIL MONDAY, APRIL 2, 2012 - SEE ADDENDUM NO. 6
Sealed bids are requested by the San Antonio Water System for the construction of the Regional Carrizo Project Schertz Parkway Pump Station, SAWS Job No. 10-8617. The project includes, but is not limited to, the following:
Construction of a 2.0 MG pre-stressed, concrete ground storage tank; four high service pump assemblies and motors; electrical building and equipment; water line piping and control stations; surge tank; asphalt access road; concrete site access drives, security fencing; and other miscellaneous site improvements as required per the Contract Documents for a complete in-place facility, the Schertz Parkway Pump Station.
Mandatory
Pre-Bid
Meeting
10:00 AM, Thursday Mar. 15, 2012San Antonio Water System Customer Service Building, 2800 U.S. Hwy 281 N, San Antonio, Texas 78212; Conference Room C-137
Downloads
Full IFB Proposal
|
||
Addendum No. 1
Mar. 14, 2012 |
||
Mandatory Pre-bid Sign-in Sheet
Mar. 15, 2012 |
||
Addendum No. 2
Mar. 19, 2012 |
||
Addendum No. 3
Mar. 26, 2012 |
||
Addendum No. 4
Mar. 27, 2012 |
||
Addendum No. 5
Mar. 29, 2012 |
||
Addendum No. 6
Mar. 30, 2012 |
||
Supplemental - Test Hole Report
Mar. 8, 2012 |
||
Supplemental - Geotechnical Study
Mar. 8, 2012 |
||
Mandatory Pre-bid Meeting Minutes
Mar. 16, 2012 |
||
Specifications
Mar. 2, 2012 Note: You must be logged in to access this document. |
||
Plans
Mar. 2, 2012 Note: You must be logged in to access this document. |
||
Bid Opening Results
Apr. 2, 2012 |
||
Bid Tab
Apr. 13, 2012 |