2021 Sanitary Sewer Overflow and Reduction Program (SSORP) Engineering Design Services Package 1
Awarded: 7/26/22
Awarded Firm:
Garver, LLC
RPS Infrastructure, Inc.
Ardurra Group, Inc
Lockwood Andrews & Newnam, Inc
Bain Medina Bain, Inc.
Garcia Infrastructure Consultants, LLC
WGI, Inc.
K Friese & Associates, Inc.
PLEASE SEE ADDENDUM 4 CHANGE FOR PROPOSAL DUE DATE
**Electronic Submissions Only**
2021 Sanitary Sewer Overflow and Reduction Program (SSORP) Engineering Design Services Package 1
Solicitation No. PS-00117
The San Antonio Water System (SAWS) is accepting Statements of Qualifications (SOQ's) from firms to provide professional engineering design services, as well as all associated engineering services, necessary to advance the sanitary sewer overflow and reduction program (SSORP) projects identified within this RFQ to the final design phase, which includes both bid and construction phase services. SAWS will provide Respondents with design deliverables as part of this RFQ.
It is anticipated that SAWS will award seven (7) Capacity Management, Operations and Maintenance (CMOM) program packages and one (1) unspecified Pipelines Condition Improvement Engineering Services contracts totaling $7 million, as a result of this Request for Qualifications (RFQ).
Non-Mandatory
Pre-Submittal
Meeting
2:00 PM, Wednesday Sep. 8, 2021WebEx Only https://saws.webex.com Meeting number (access code): 146 831 2276 Password: BBpPbaVB385 Connect by Phone: (210) 233-2090
Downloads
Full RFQ Proposal
Note: You will be prompted to login to access the full proposal document. |
||
Project Scoping Report CMOM Package 1
Aug. 26, 2021 |
||
Project Scoping Report CMOM Package 2
Aug. 26, 2021 |
||
Project Scoping Report CMOM Package 3
Aug. 26, 2021 |
||
Project Scoping Report CMOM Package 4
Aug. 26, 2021 |
||
Project Scoping Report CMOM Package 5
Aug. 26, 2021 |
||
Project Scoping Report CMOM Package 6
Aug. 26, 2021 |
||
Project Scoping Report CMOM Package 7
Aug. 26, 2021 |
||
Project Scoping Report CMOM Pkg 2 Addendum 1
Sep. 2, 2021 |
||
Non-Mandatory Pre-Submittal Presentation_9.8.21
Sep. 8, 2021 |
||
Non-Mandatory Pre-Submittal Sign In Sheet_9.8.21
Sep. 8, 2021 |
||
Updated Evaluation Criteria Forms Word Version
Sep. 21, 2021 |
||
Addendum 1
Sep. 2, 2021 |
||
Addendum 2
Sep. 2, 2021 |
||
Project Scoping Report CMOM Pkg 5 Addendum 1
Sep. 2, 2021 |
||
Addendum 3
Sep. 15, 2021 |
||
Addendum 4
Sep. 21, 2021 |