Leon Creek WRC to Steven M. Clouse WRC Recycled Water Interconnect-Phase 1 Project

Solicitation No. PS-00109-SM
Status: Selection Approved and Awarded
Awarded: 9/14/21
Due Date: 2:00 PM Thursday, 6/3/21

Awarded Firm: CP&Y Inc

 Leon Creek WRC to Steven M. Clouse WRC Recycled Water Interconnect-Phase 1 Project

Solicitation No.: PS-00109-SM

 

The San Antonio Water System (SAWS) is pursuing a Request for Qualifications (RFQ) for professional engineering services for the Leon Creek WRC to Steven M. Clouse WRC Recycled Water Interconnect - Phase 1 (“Project”). Statements of Qualifications (SOQs) from interested firms (Respondents) are being accepted in connection with this Project, which will require the scope of services to be performed by qualified professional engineering firms (Consultants). The selected professional engineering firm shall provide engineering services, which will entail planning, engineering evaluations, studies, reports, preliminary engineering, design, bid, construction, start-up/commissioning, and overall project management services for the design and construction of the Projects.

The anticipated services for the Project will include project management and coordination, topographic survey services, subsurface utility engineering, preliminary engineering, design, construction phase services, project coordination, scheduling, cost estimating, and other engineering services as necessary. Engineering disciplines under this contract may include civil, mechanical, structural, geotechnical, electrical, instrumentation and controls, and others as needed.

SAWS anticipates awarding one (1) contract as a result of this RFQ.

Non-Mandatory
Pre-Submittal Meeting

2:00 PM, Tuesday May. 11, 2021
WebEx

Notify Me

Receive updates sent straight to your inbox.

Interested Firm List

Firms who have obtained the RFQ proposal.

Downloads

Full RFQ Proposal
Note: You will be prompted to login to access the full proposal document.
Criteria Forms
May. 3, 2021
Non-Mandatory Pre-Submittal Presentation
May. 11, 2021
Non-Mandatory Pre-Submittal Sign-In Sheet
May. 11, 2021
Addendum 1
May. 18, 2021