2011 Annual Sanitary Sewer Main Point Repair and Manhole Adjustments Package 2
Awarded:
Sealed bids are requested by the San Antonio Water System to furnish all labor, materials, equipment and supervision to perform point repairs to the wastewater collection system pipelines and to adjust manholes, on a work order contract basis for the 2011 Annual Sanitary Sewer Main Point Repair and Manhole Adjustments Package 2 Project, SAWS Job No. 11-0111 & 11-1402.
Downloads
Full IFB Proposal
|
||
Contract Bid Documents & Specifications
Aug. 25, 2011 Note: You must be logged in to access this document. |
||
Bid Opening Results
Sep. 13, 2011 |
||
Bid Tab
Sep. 28, 2011 |