Turtle Creek No. 2, Well No. 2 Well Pump Improvements
Awarded:
The San Antonio Water System (SAWS) is accepting bids for Turtle Creek No. 2, Well No. 2 Replacement requiring purchase, delivery, installation, and field testing of one (1) vertical hollow line shaft well pumping unit, which includes, but is not limited to, the 4160V, 3-phase, 600 HP motor, well discharge head, column pipe, line shaft, pump bowls, impellers, couplings, bearings, and all fittings and ancillaries, required for a complete pumping unit that meets the field testing requirements. Delivery date shall be no more than 120 calendar days after receipt of the SAWS Purchase Order, and installation shall be completed within 10 days of delivery. Failure to deliver and install all components specified herein to the Turtle Creek #2 Pump Station site located at 8523 Data Point, San Antonio, Texas 78229 by the established date will result in a deduction of $1,000.00 per day past the established completion date from the total bid price. Performance level shall meet specifications contained herein. All shipping, delivery, installation, and testing costs shall be included in the bid.
Mandatory
Pre-Bid
Meeting
9:30 AM, Tuesday Apr. 16, 20138523 Data Point San Antonio, TX 78229
Plan Holders List
View plan holders list.Downloads
Full Invitation to Bid
Note: You will be prompted to login to access the full proposal document. |
||
Sign In Sheet from Pre Bid Meeting
Apr. 17, 2013 |
||
Addendum No. 1
Apr. 22, 2013 |
||
Bid Opening Results
May. 14, 2013 |
||
Bid Tab
Jun. 25, 2013 |