Bid Opening Results
The bid opening results appearing on this page reflect the amount of each bid received and, subsequently, read at the bid opening. This summary is posted after the bid opening and does not represent the official results. A bid tabulation with the official results will be posted within ten (10) days of the bid opening date and may be viewed in the Bid Tab section
Results 221 - 240 of 1272 | « 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 » |
Bid No. | Type | Close Date | Project Name | Details |
18-18107 | IFB | 9/13/18 | Purchase of HD Inspection Camera System | View Results PDF |
18-2065 | IFB | 9/13/18 | Annual Contract for Vertical Shores Parts and Service | View Results PDF |
18-18109 | IFB | 9/13/18 | Purchase of Handheld Cut-Off Machine | View Results PDF |
18-18100 | IFB | 9/7/18 | Annual Contract for Print Shop Equipment and Services | View Results PDF |
18-18086-1 | IFB | 9/7/18 | One Time Purchase of Uninterruptible Power Supply (UPS) for SAWS Datacenter | View Results PDF |
18-0020A | IFB | 9/4/18 | Annual Contract for Billing and Return Envelopes | View Results PDF |
18-1406 | IFB | 8/28/18 | Annual Contract for Safety Vests | View Results PDF |
18-18106 | IFB | 8/24/18 | Purchase and Installation of Well Pumps and Motors at H2OAK Brackish Groundwater Desalination Plant | View Results PDF |
18-0098 | IFB | 8/22/18 | Annual Contract for Bottle Water | View Results PDF |
18-18084 | IFB | 8/22/18 | One Time Purchase of Inductively Coupled Plasma Mass Spectrometry System | View Results PDF |
18-18034 | IFB | 8/21/18 | Annual Contract for Mechanical Maintenance and Repair Services Assistance | View Results PDF |
18-18103 | IFB | 8/20/18 | Purchase of Fence TCEQ Repair and Alterations | View Results PDF |
18-0378 | IFB | 8/20/18 | Annual Contract for Rainwear | View Results PDF |
18-18101 | IFB | 8/14/18 | Annual Contract for Quick Set Flowable Fill and Concrete Delivery | View Results PDF |
18-18098 | IFB | 8/10/18 | Early Procurement of Lime Saturator Solids Contact Units for the Central Water Integration Pipeline Project | View Results PDF |
18-6023A | IFB | 8/7/18 | Annual Contract for Dell Desktops, Laptops, Monitors and Accessories | View Results PDF |
18-4016A | IFB | 8/6/18 | Annual Contract for Charter Bus Services | View Results PDF |
18-1317 | IFB | 7/31/18 | Annual Contract for Paris Electronic Document Server Maintenance Renewal | View Results PDF |
18-18097 | IFB | 7/27/18 | Early Procurement of Lime Storage Silo and Feed Equipment for Central Water Integration Pipeline Project | View Results PDF |
18-18099 | IFB | 7/27/18 | Early Procurement of Medium Voltage Switchgear for the Central Water Integration Pipeline Project | View Results PDF |
Results 221 - 240 of 1272 | « 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 » |