Bid Tabs
**The bid tabulations appearing on this page are for contracts that have been approved by the Board of Trustees and executed. If a tab you are looking for cannot be found on this page, it means that the contract has not yet been executed. Please check back frequently to view updated bid results:
Solicitation No.
|
Type
|
Job No.
|
Close Dated
|
Project Name
|
Details
|
CO-00312-RL
|
IFB
|
19-1019
|
1/29/20
|
DICKERSON 16-INCH OVERSIZE (8-INCH REQUIRED) WATER MAIN EXTENSION
|
View Results PDF
|
B-19-031-JAM
|
IFB
|
20-0112
|
1/15/20
|
2020 Annual Concrete Placement Work Order Construction Contract, Package I
|
View Results PDF
|
CO-00294-FF
|
IFB
|
18-4004
|
1/13/20
|
PLEASANTON ROAD WATER MAIN REPLACEMENT AT HUME ROAD PROJECT
|
View Results PDF
|
B-19-015-FF
|
RFCSP
|
17-0113
|
1/6/20
|
NACO GROUND STORAGE TANK REHABILITATION PROJECT
|
View Results PDF
|
CO-00316-FF
|
IFB
|
19-4517
|
12/17/19
|
BLUE WING ROAD TO IH 37 SEWER PROJECT
|
View Results PDF
|
CD-B-19-024-AT
|
IFB
|
20-0107
|
12/4/19
|
2020 Annual Sanitary Sewer Main Point Repair, Manhole Adjustments and Laterals Construction Contract, Package 2
|
View Results PDF
|
CD-B-19-023-AT
|
IFB
|
20-0106
|
12/4/19
|
2020 Annual Sanitary Sewer Main Point Repair, Manhole Adjustments and Laterals Construction Contract, Package 1
|
View Results PDF
|
CD-B-19-022-SM
|
IFB
|
|
12/3/19
|
2020 Sanitary Sewer Laterals Renewal and Repair Construction Contract, Package 2 Project
|
View Results PDF
|
CD-B-19-021-SM
|
IFB
|
|
12/3/19
|
2020 Sanitary Sewer Laterals Renewal and Repair Construction Contract, Package 1 Project
|
View Results PDF
|
B-19-029-JAM
|
RFCSP
|
19-0128
|
11/6/19
|
Medical Elevated Storage Tank Overcoat Project
|
View Results PDF
|
CO-00311-AT
|
IFB
|
19-4534
|
11/5/19
|
Package 8 Replacement - Bitters Site Bore Project
|
View Results PDF
|
CO-00308-SM
|
IFB
|
17-4534
|
11/5/19
|
Multiple Sewershed Package 7B Project
|
View Results PDF
|
CO-00290-JP
|
IFB
|
18-6004
|
11/1/19
|
Mission Pump Station Additional Well
|
View Results PDF
|
CO-00269-FF
|
IFB
|
18-4525
|
10/30/19
|
MULTIPLE SEWERSHED PACKAGE 11A
|
View Results PDF
|
B-19-028-AT
|
IFB
|
20-0111
|
10/25/19
|
2020 Annual Water Distribution Leak Repairs, Package 4
|
View Results PDF
|
B-19-027-AT
|
IFB
|
20-0110
|
10/25/19
|
2020 Annual Water Distribution Leak Repairs, Package 3
|
View Results PDF
|
B-19-026-AT
|
IFB
|
20-0109
|
10/24/19
|
2020 Annual Water Distribution Leak Repairs, Package 2
|
View Results PDF
|
B-19-025-AT
|
IFB
|
20-0108
|
10/24/19
|
2020 Annual Water Distribution Leak Repairs, Package 1
|
View Results PDF
|
B-19-011-JP
|
IFB
|
|
10/4/19
|
Lease of Transferable Edwards Aquifer Authority Groundwater Withdrawal Rights
|
View Results PDF
|
B-19-017-AT
|
IFB
|
19-0132
|
9/17/19
|
Steven M. Clouse Water Recycling Center Perimeter Fence
|
View Results PDF
|
Need the free Adobe® Reader® for PDF files?
Click here.
|