Bid Opening Results
The bid opening results appearing on this page reflect the amount of each bid received and, subsequently, read at the bid opening. This summary is posted immediately after the bid opening and does not represent the official results. A bid tabulation with the official results will be posted within ten (10) days of the bid opening date and may be viewed in the Bid Tab section. In addition, SAWS will conduct a Determination of Contractor Responsibility for the apparent low bidder, prior to Board Award.
Solicitation No.
|
Type
|
Job No.
|
Close Date
|
Project Name
|
Details
|
B-11-012-DD
|
IFB
|
11-5006 & 11-5506
|
3/29/11
|
2011 Water & Sewer Construction, Package IV
|
View Results PDF
|
B-11-011-DD
|
IFB
|
11-5005 & 11-5505
|
3/29/11
|
2011 Water & Sewer Construction Package, Package III
|
View Results PDF
|
B-11-003-RA
|
IFB
|
10-8624-202
|
3/11/11
|
Pinn Rd Recycled Water Pump Station Improvements Project
|
View Results PDF
|
B-11-010-RA
|
IFB
|
11-0104 & 11-1401
|
2/22/11
|
2011 Annual Water Distribution Leak Repairs Contract – Package 2
|
View Results PDF
|
B-11-009-RA
|
IFB
|
11-0103 & 11-1401
|
2/22/11
|
2011 Annual Water Distribution Leak Repairs Contract – Package 1
|
View Results PDF
|
B-11-007-RA
|
IFB
|
10-8625-218
|
2/22/11
|
Fence Construction: Nelson, Baker and Pattillo Tracts
|
View Results PDF
|
B-11-008-MR
|
IFB
|
07-3004
|
2/10/11
|
Borgfeld Road – West, 16-Inch Oversized Water Project
|
View Results PDF
|
B-11-001-DD
|
IFB
|
08-6505
|
1/31/11
|
Install Digester Gas Flowmeters Dos Rios WRC
|
View Results PDF
|
B-11-006-RA
|
IFB
|
11-0101
|
1/28/11
|
Annual 2011 Asphalt Overlay Work Order Construction Contract Project
|
View Results PDF
|
B-10-057-DD
|
IFB
|
08-6502
|
12/17/10
|
Dos Rios Water Recycling Center (WRC) Re-Rating Headworks Improvements and Process Enhancements, Phase I Project
|
View Results PDF
|
B-10-055-DD
|
IFB
|
11-2503
|
12/14/10
|
Medina River Sewer Outfall - Segment 2
|
View Results PDF
|
B-10-060-CM
|
IFB
|
10-5124 & 10-5624
|
11/18/10
|
2011 Water and Sewer Construction Package II
|
View Results PDF
|
B-10-059-CM
|
IFB
|
10-5123 & 10-5623
|
11/18/10
|
2011 Water and Sewer Construction Package 1 Project
|
View Results PDF
|
B-10-058-CM
|
IFB
|
10-1025
|
11/4/10
|
Anderson Tract 16-inch Oversize (12-Inch Required) Water Mian Project
|
View Results PDF
|
B-10-044-CM
|
IFB
|
10-4001
|
10/29/10
|
2010 Open Cut Water Work Order Construction Contract
|
View Results PDF
|
B-10-048-DD
|
IFB
|
06-2503
|
10/28/10
|
Lift Stations Rehabilitation – Phase 2 Project
|
View Results PDF
|
B-10-050-DD
|
IFB
|
07-7003
|
10/19/10
|
Water Transmission Main – Rogers Ranch to I.H. 10 Project
|
View Results PDF
|
B-10-052-MR
|
IFB
|
07-3008
|
10/12/10
|
Borgfeld Road – East, 16-Inch and 24-Inch Oversize (12-Inch Required) Water Main Project
|
View Results PDF
|
B-10-056-DG
|
IFB
|
09-6005
|
10/6/10
|
Pressure Reducing Valve (PRV) Flow Monitoring and Pressure Monitoring Project
|
View Results PDF
|
B-10-053-MR
|
IFB
|
07-6006-113
|
10/5/10
|
Cross Mountain Elevated Storage Tank Project
|
View Results PDF
|