Cross Mountain Trail 24-Inch Water Transmission Main Project
Awarded:
Sealed bids are requested by the San Antonio Water System for the construction of approximately 7,650 linear feet of 24-inch diameter water main to include but not limited to water main tie-ins, pipeline installation at various depths, bore and/or tunneling under existing roadways and driveways, fittings and other water main appurtenances, trench excavation safety protection, tree protection, erosion control and traffic control measures for the Cross Mountain Trail 24-Inch Water Transmission Main Project, SAWS Job No.(s) 10-7003.
Non-Mandatory
Pre-Bid
Meeting
10:00 AM, Friday Apr. 13, 2012San Antonio Water System Customer Service Building, 2800 U.S. Hwy 281 N, San Antonio, Texas 78212; Conference Room C-137
Downloads
Full IFB Proposal
|
||
Plans Part 1
Mar. 23, 2012 |
||
Plans Part 2
Mar. 23, 2012 |
||
Non-Mandatory Pre-Bid Sign-In Sheet
Apr. 13, 2012 |
||
Addendum No. 1
Apr. 20, 2012 |
||
Addendum No. 1 - Exhibit A2
Apr. 20, 2012 |
||
Addendum No. 1 - Exhibit A3
Apr. 20, 2012 |
||
Supplemental - Map
Apr. 13, 2012 |
||
Specifications
Mar. 23, 2012 Note: You must be logged in to access this document. |
||
Bid Opening Results
Apr. 25, 2012 |
||
Bid Tab
May. 7, 2012 |