Leon Creek WRC Flow Management Upgrades Project
SOLICITATION NO: PS-00154
RELEASE DATE: July 10, 2023
REQUEST FOR QUALIFICATIONS
LEON CREEK WRC FLOW MANAGEMENT UPGRADES PROJECT
Objective
The San Antonio Water System (SAWS) is pursuing Requests for Qualifications (RFQ) for professional engineering services for the Leon Creek WRC Flow Management Upgrades Project (“Project”). Statements of Qualifications (SOQs) from interested firms (Respondents) are being accepted in connection with this Project, which will require the scope of services to be performed by a qualified professional engineering firm. The selected firm shall provide engineering services entailing planning, engineering evaluations, studies, reports, preliminary engineering, design, bid, construction, start-up/commissioning, and overall project management and coordination services for the design and construction of the Project.
The anticipated services will include project management and coordination, civil, mechanical, structural and electrical engineering, instrumentation and controls, surveying, permitting, geotechnical engineering, subsurface utility engineering, constructability, scheduling, cost estimating, construction management, and other services as necessary for the Project.
Estimated Timeline
July 10, 2023,................................................................................... RFQ Released
July 19, 2023, at 10:00 a.m. CDT.............. Non-Mandatory Pre-Submittal Conference
July 20, 2023, at 10:00 a.m. CDT....................................... Non-Mandatory Site Visit
July 24, 2023, by 4:00 p.m. CDT........................... Receipt of Written Questions Due
July 31, 2023, by 4:00 p.m. CDT......................................... Q & A Posted to Website
August 9, 2023, by 2:00 p.m.CDT...................................................... Proposals Due
August 2023............................................................................ Proposals Evaluated
September 2023.................................................................. Interviews, if necessary
November 7, 2023........................................ SAWS Board Consideration and Award
November 2023.......................................................... Non-Selection Notices mailed
November 2023...................................................................................... Start Work
The dates listed above are subject to change without notice.
Non-Mandatory
Pre-Submittal
Meeting
10:00 AM, Wednesday Jul. 19, 2023https://saws.webex.com Meeting Number (access code): 2488 685 0385 Meeting Password: mPMrPJ3RN67 Audio Connection: (210) 233-2090
Downloads
Full RFQ Proposal
Note: You will be prompted to login to access the full proposal document. |
||
PS-00154 Evaluation Forms (Word)
Jul. 9, 2023 |
||
PS-00154 Non-Mandatory Pre-Submittal Slides
Jul. 19, 2023 |
||
PS-00154 Site Visit Sign In Sheet
Jul. 20, 2023 |
||
PS-00154 Addendum 1
Jul. 31, 2023 |