Forest Crest Water Local Benefit Main
Awarded:
Sealed bids are requested by the San Antonio Water System for the construction of approximately 6,200 lf of 12-inch main for the Forest Crest Water Local Benefit Main Project, SAWS Job No. 10-7004, along Great Navajo Road and Tejas Trail East and West, service lines up to the property line of approximately 35 residential lots, and the relocation of a skid-mounted booster station, hydropneumatic tank, sound attenuation blanket, electric control panels and SCADA controls and antenna from Sundance Ranch to the corner of Great Navajo and Tejas Trail to be set up as a pump station with minor repairs and updates to the equipment.
Mandatory
Pre-Bid
Meeting
10:00 AM, Friday Jan. 27, 2012SAWS’ Sundance Ranch Pump Station, located at 25334 Toutant Beauregard, San Antonio TX 78255
Downloads
Full IFB Proposal
|
||
Mandatory Pre-bid Sign-in Sheet
Jan. 27, 2012 |
||
Addendum No. 1
Feb. 2, 2012 |
||
Supplemental Information
Jan. 13, 2012 |
||
Specifications
Jan. 13, 2012 Note: You must be logged in to access this document. |
||
Plans
Jan. 13, 2012 Note: You must be logged in to access this document. |
||
Bid Opening Results
Feb. 6, 2012 |
||
Bid Tab
Feb. 17, 2012 |