Recycled Water Interconnect Flow Control Valve
Awarded:
*PLEASE NOTE: THE PRE-BID MEETING LOCATION HAS CHANGED*
Sealed bids are requested by the San Antonio Water System for the construction of a flow meter vault and an above-ground flow control valve assembly on a 24-inch recycled water line at the Basse Road Recycled Water Facility, including site fencing, miscellaneous site work and all associated electrical and instrumentation work for the Recycled Water Interconnect Flow Control Valve Project, SAWS Job No. 09-8605.
Non-Mandatory
Pre-Bid
Meeting
10:00 AM, Tuesday Jul. 6, 2010San Antonio Water System Customer Service Building, 2800 U.S. Hwy 281 N, San Antonio, Texas 78212; 1st floor Conference Room CR-C137
Downloads
Full IFB Proposal
|
||
Pre-Bid Meeting Sign In Sheet
Jul. 6, 2010 |
||
Addendum 2
Jul. 14, 2010 |
||
Pre-Bid Meeting Agenda
Jul. 14, 2010 |
||
Addendum
Jun. 30, 2010 |
||
Specifications
Jun. 24, 2010 Note: You must be logged in to access this document. |
||
Plans
Jun. 25, 2010 Note: You must be logged in to access this document. |
||
Bid Opening Results
Jul. 16, 2010 |
||
Bid Tab
Jul. 23, 2010 |