Bid Opening Results

The bid opening results appearing on this page reflect the amount of each bid received and, subsequently, read at the bid opening. This summary is posted immediately after the bid opening and does not represent the official results. A bid tabulation with the official results will be posted within ten (10) days of the bid opening date and may be viewed in the Bid Tab section. In addition, SAWS will conduct a Determination of Contractor Responsibility for the apparent low bidder, prior to Board Award.

Results 1 - 20 of 828 « 1 2 3 4 5 6 7 8 9 10 11 »
Solicitation No. Type Job No. Close Date Project Name Details
CO-00742-RL IFB 24-0123 & 24-1401 5/7/24 2024 Annual Water Distribution Leak Repairs Contract, Package 6 View Results PDF
CO-00741-RL IFB 24-0122 & 24-1401 5/7/24 2024 Annual Water Distribution Leak Repairs Contract, Package 5 View Results PDF
CO-00640-LE IFB 22-4522 5/6/24 Probandt Replacement Project (E. Lachapelle to Oelkers) View Results PDF
CO-00751-LE IFB 22-0144 5/3/24 Leon Creek WRC Primary Clarifier Nos. 1 and 2 Rehabilitation Project View Results PDF
CO-00731-RM IFB 24-0119/24-1401 5/2/24 2024 Annual Asphalt Overlay Work Order Construction Contract, Package 4 View Results PDF
CO-00730-RM IFB 24-0118/24-1401 5/1/24 2024 Annual Asphalt Overlay Work Order Construction Contract, Package 3 View Results PDF
CO-00724-RM IFB 23-4519 4/25/24 2023 Sewer Main Replacement Project 3 View Results PDF
CO-00744-RL IFB 23-1044 4/23/24 Luensmann Off-Site Water Main Extension (Phase 2) View Results PDF
CO-00729-TG IFB 22-0152 4/19/24 West Side Operations Center Supply Building Drainage Improvements View Results PDF
CO-00727-RL IFB 23-5080 & 23-5580 4/9/24 2025 SMP Package IV (Bell Drive) View Results PDF
CO-00728-JP IFB 4/4/24 2024 Water Well Mitigation Program View Results PDF
CO-00733-TG IFB 22-1102 4/2/24 Tres Laurels 16-Inch Water Main Extension View Results PDF
CO-00684-RL IFB 23-4513 2/9/24 2021 CMOM Package 2A (CIPP) Project View Results PDF
CO-00722-RM IFB 22-1597 2/8/24 Ruby Crossing Offsite Sewer Gravity Main View Results PDF
CO-00703-RL IFB 22-7002 2/6/24 Mathis Road – Hardy Road to Waterwood Pass Approach Water Main View Results PDF
CO-00705-JP IFB 22-7008 1/31/24 Benclare Estates Offsite SAWS Pressure Reducing Valve Facility View Results PDF
CO-00713-LE IFB 22-4510 1/22/24 SAWS 2021 CMOM PACKAGE 6 - OPEN CUT AND PIPE BURST View Results PDF
CO-00696-TG IFB 24-0109 & 24-1401 1/18/24 2024 Annual Water Distribution Leak Repairs Contract Package 4 View Results PDF
CO-00695-TG IFB 24-0108 & 24-1401 1/16/24 2024 Annual Water Distribution Leak Repairs Contract Package 3 View Results PDF
CO-00719-SM IFB 23-7003 12/11/23 Stonehill Off-Site Water Extension Phase II View Results PDF
Results 1 - 20 of 828 « 1 2 3 4 5 6 7 8 9 10 11 »