Recycled Water Infrastructure Upgrades and 2021 Engineering Work Order Contracts

Solicitation No. PS-00103-FG
Status: Selection Approved and Awarded
Awarded: 6/8/21
Due Date: 2:00 PM Friday, 2/12/21

Awarded Firm: CP&Y, Inc.
Garcia Infrastructure Consultants, L.L.C.
Kimley-Horn and Associates, Inc.
Weston Solutions, Inc.

 Recycled Water Infrastructure Upgrades and 2021 Engineering Work Order Contracts

Solicitation No. PS-00103-FG

The San Antonio Water System (SAWS) is pursuing a Request for Qualifications (RFQ) for professional engineering services for the Recycled Water Infrastructure Upgrades and 2021 Engineering Work Order Contracts (“Project”). Statements of Qualifications (SOQs) from interested firms (Respondents) are being accepted in connection with this Project, which will require the scope of services to be performed by qualified professional engineering firms (Consultants). The selected professional engineering firms shall provide engineering services, which will entail planning, engineering evaluations, studies, reports, preliminary engineering, design, bid, construction, start-up/commissioning, and overall project management services for the design and construction of the Projects.

The anticipated services for the Project will include project management and coordination, topographic survey services, subsurface utility engineering, preliminary engineering, design, construction phase services, project coordination, scheduling, cost estimating, and other engineering services as necessary. Engineering disciplines under this contract may include civil, mechanical, structural, geotechnical, electrical, instrumentation and controls, and others as needed.

SAWS anticipates awarding one or more contracts as a result of this RFQ.

Non-Mandatory
Pre-Submittal Meeting

11:00 AM, Friday Jan. 22, 2021
Webex Only (https://saws.webex.com Meeting number (access code): 146 020 0070 Meeting password: Umbu35iJWF4 Audio Connection: (210) 233-2090)

Notify Me

Receive updates sent straight to your inbox.

Interested Firm List

Firms who have obtained the RFQ proposal.

Downloads

Full RFQ Proposal
Note: You will be prompted to login to access the full proposal document.
Attachment III - Word Document
Jan. 13, 2021
PS-00103 Non Mandatory Pre Submittal Presentation
Jan. 22, 2021
PS-00103 Non Mandatory Pre Submittal Attendance
Jan. 22, 2021
Addendum
Feb. 2, 2021
Addendum 2 - PS-00103-FG, Recycled Water Infrastructure Upgrades and 2021 Engineering Work Order Contracts
Feb. 4, 2021
Addendum 3 - PS-00103-FG, Recycled Water Infrastructure Upgrades and 2021 Engineering Work Order Contracts
Feb. 11, 2021