Recycled Water Infrastructure Upgrades and 2021 Engineering Work Order Contracts
Awarded: 6/8/21
Awarded Firm:
CP&Y, Inc.
Garcia Infrastructure Consultants, L.L.C.
Kimley-Horn and Associates, Inc.
Weston Solutions, Inc.
Recycled Water Infrastructure Upgrades and 2021 Engineering Work Order Contracts
Solicitation No. PS-00103-FG
The San Antonio Water System (SAWS) is pursuing a Request for Qualifications (RFQ) for professional engineering services for the Recycled Water Infrastructure Upgrades and 2021 Engineering Work Order Contracts (“Project”). Statements of Qualifications (SOQs) from interested firms (Respondents) are being accepted in connection with this Project, which will require the scope of services to be performed by qualified professional engineering firms (Consultants). The selected professional engineering firms shall provide engineering services, which will entail planning, engineering evaluations, studies, reports, preliminary engineering, design, bid, construction, start-up/commissioning, and overall project management services for the design and construction of the Projects.
The anticipated services for the Project will include project management and coordination, topographic survey services, subsurface utility engineering, preliminary engineering, design, construction phase services, project coordination, scheduling, cost estimating, and other engineering services as necessary. Engineering disciplines under this contract may include civil, mechanical, structural, geotechnical, electrical, instrumentation and controls, and others as needed.
SAWS anticipates awarding one or more contracts as a result of this RFQ.
Non-Mandatory
Pre-Submittal
Meeting
11:00 AM, Friday Jan. 22, 2021Webex Only (https://saws.webex.com Meeting number (access code): 146 020 0070 Meeting password: Umbu35iJWF4 Audio Connection: (210) 233-2090)
Downloads
Full RFQ Proposal
Note: You will be prompted to login to access the full proposal document. |
||
Attachment III - Word Document
Jan. 13, 2021 |
||
PS-00103 Non Mandatory Pre Submittal Presentation
Jan. 22, 2021 |
||
PS-00103 Non Mandatory Pre Submittal Attendance
Jan. 22, 2021 |
||
Addendum
Feb. 2, 2021 |
||
Addendum 2 - PS-00103-FG, Recycled Water Infrastructure Upgrades and 2021 Engineering Work Order Contracts
Feb. 4, 2021 |
||
Addendum 3 - PS-00103-FG, Recycled Water Infrastructure Upgrades and 2021 Engineering Work Order Contracts
Feb. 11, 2021 |