2020 Production Facilities Improvements
Awarded: 9/22/20
Awarded Firm:
Lockwood, Andrews & Newnam, Inc.
Tetra Tech
LNV, Inc.
CP&Y, Inc. dba STV Infrastructure
*** ELECTRONIC SUBMITTALS ACCEPTED ONLY***
2020 Production Facilities Improvements
PS-00097
The San Antonio Water System, hereafter referred to as SAWS, is pursuing Request for Qualifications (RFQs) for professional engineering services for the 2020 Production Facilities Improvements Project (“Project”). Statements of Qualifications (SOQs) from interested firms (Respondents) are being accepted in connection with the identified projects, which will require the scope of services to be performed by qualified professional engineering firms (Consultants). The selected professional engineering firms shall provide engineering services entailing planning, engineering evaluations, studies, reports, preliminary engineering, design, bid, construction, inspection, start-up/commissioning, and overall project management services for the design and construction of the Project.
The anticipated services will include project management and coordination, civil, mechanical, structural, and electrical engineering services, instrumentation and controls, surveying, permitting, geotechnical engineering, subsurface utility engineering, preliminary engineering, design, scheduling, cost estimating, construction management and other services as necessary for the Project.
SAWS anticipates awarding a contract to more than one Consultant as a result of this RFQ.
Non-Mandatory Pre-Submittal Conference
May 13, 2020 at 10:00 a.m. CST
WEBEX ONLY (Download WebEx Instruction)
|
Access Information |
Meeting Number: 992 396 916
For Audio Connection Dial: 210-233-2550 (SAWS WebEx) Access Code: 996 136 639 Password: Ps-00097 |
|
Notify Me
Receive updates sent straight to your inbox.
Subscribe
Interested Firm List
Firms who have obtained the RFQ proposal.
Non-Mandatory
Pre-Submittal
Meeting
10:00 AM, Wednesday May. 13, 2020WebEx
Downloads
Full RFQ Proposal
Note: You will be prompted to login to access the full proposal document. |
||
WEBEX Instructions
Apr. 30, 2020 |
||
Criteria Forms
May. 5, 2020 |
||
Non-Mandatory Pre-Submittal Conference Presentation
May. 13, 2020 |
||
Addendum 1
May. 22, 2020 |