STEVEN M. CLOUSE WRC DIGESTER MIXING AND SYSTEM ENHANCEMENTS - PHASE 3

Solicitation No. PS-00083-FF
Status: Under Review
Due Date: 2:00 PM Friday, 11/22/19

The San Antonio Water System (SAWS) is pursuing requests for qualifications (RFQ) for professional engineering services for the Steven M. Clouse Water Recycling Center (WRC) Digester Mixing and System Enhancements Phase 3 Project. Statements of qualifications (SOQs) from interested firms (Respondents) are being accepted in connection with this Project, which will require the scope of services to be performed by a qualified professional engineering firm. The selected Consultant w provide engineering services entailing planning, engineering evaluations, studies, reports, preliminary engineering, design, bid, construction, inspection, startup/commissioning, and overall project management services for the design and construction of the Project. The Steven M. Clouse WRC is formerly known as Dos Rios WRC. 

 

Non-Mandatory Site Visit will immediately follow the Non-Mandatory Pre-Submittal Meeting on November 7, 2019 at 10:00 am (CT).

Non-Mandatory
Pre-Submittal Meeting

10:00 AM, Thursday Nov. 7, 2019
Steven M. Clouse Water Recycling Center, 3495 Valley Road, San Antonio, Texas 78221; Administration Building 16 Meeting Room

Notify Me

Receive updates sent straight to your inbox.

Interested Firm List

Firms who have obtained the RFQ proposal.

Downloads

Full RFQ Proposal
Note: You will be prompted to login to access the full proposal document.
Non-Mandatory Pre-Submittal Conference Presentation
Nov. 7, 2019
Non-Mandatory Pre-Submittal Conference Sign-In Sheet
Nov. 7, 2019
Addendum 1
Oct. 25, 2019
Addendum 2
Nov. 14, 2019